3
Shared Docs
3
Same-Page
3 / 3
Mentions
00 Plaster and Gypsum Board $ 2,000 09 30 00 Stone and Tile - Allowance $ 83.122 09 60 00 Sand,
$ 21,900 02 40 00 Demolition $ 25,000 06 20 00 Terrace Decking and Bench $ 12.000 06 40 00 Architectural Woodwork $ 102,150 08 10 00 Closet Doors - Allowance $ 14,850 08 50 00 Window Insulation NIC 08 70 00 Hardware - Allowance $ 14.300 08 80 00 Glazing - Allowance $ 2,100 09 20 00 Plaster a
00 Plaster and Gypsum Board $ 2,000 09 30 00 Stone and Tile - Allowance $ 83.122 09 60 00 Sand,
$ 21,900 02 40 00 Demolition $ 25,000 06 20 00 Terrace Decking and Bench $ 12.000 06 40 00 Architectural Woodwork $ 102,150 08 10 00 Closet Doors - Allowance $ 14,850 08 50 00 Window Insulation NIC 08 70 00 Hardware - Allowance $ 14.300 08 80 00 Glazing - Allowance $ 2,100 09 20 00 Plaster a
00 Plaster and Gypsum Board $ 2,000 09 30 00 Stone and Tile - Allowance $ 83.122 09 60 00 Sand,
$ 21,900 02 40 00 Demolition $ 25,000 06 20 00 Terrace Decking and Bench $ 12.000 06 40 00 Architectural Woodwork $ 102,150 08 10 00 Closet Doors - Allowance $ 14,850 08 50 00 Window Insulation NIC 08 70 00 Hardware - Allowance $ 14.300 08 80 00 Glazing - Allowance $ 2,100 09 20 00 Plaster a
Entities connected to both Oliver Stone and Closet Doors - Allowance
Bath Fixtures
ORGANIZATIONArchitectural Woodwork
ORGANIZATIONPlaster and Gypsum Board
ORGANIZATIONParquet Floors
ORGANIZATIONCalifornia Closets - Allowance
ORGANIZATIONSwitch Plates
ORGANIZATIONCNY Construction Management, Inc.
ORGANIZATIONGeneral Contractors / Construction Managers
ORGANIZATIONTerrace Decking
ORGANIZATIONOPENINGS
ORGANIZATIONIIVAC
ORGANIZATIONCatena Carty
ORGANIZATIONSlone Camtettap
PERSONINWPAL
ORGANIZATION