3
Shared Docs
3
Same-Page
3 / 3
Mentions
00 Plaster and Gypsum Board $ 2,000 09 30 00 Stone and Tile - Allowance $ 83.122 09 60 00 Sand,
ces - Allowance $ 22,000 12 20 00 Install Draperies NIC 12 40 00 California Closets - Allowance $ 70.400 22 30 00 Replace Kitchen Sink and Bath Fixtures $ 29,850 23 30 00 Wall A/C Units - Allowance $ 16,000 26 00 00 Replace Receptacles. Switch Plates $ 7,000 26 50 00 Lighting Installation
00 Plaster and Gypsum Board $ 2,000 09 30 00 Stone and Tile - Allowance $ 83.122 09 60 00 Sand,
ces - Allowance $ 22,000 12 20 00 Install Draperies NIC 12 40 00 California Closets - Allowance $ 70.400 22 30 00 Replace Kitchen Sink and Bath Fixtures $ 29,850 23 30 00 Wall A/C Units - Allowance $ 16,000 26 00 00 Replace Receptacles. Switch Plates $ 7,000 26 50 00 Lighting Installation
00 Plaster and Gypsum Board $ 2,000 09 30 00 Stone and Tile - Allowance $ 83.122 09 60 00 Sand,
ces - Allowance $ 22,000 12 20 00 Install Draperies NIC 12 40 00 California Closets - Allowance $ 70.400 22 30 00 Replace Kitchen Sink and Bath Fixtures S 29,850 23 30 00 Wall A/C Units - Allowance $ 16,000 26 00 00 Replace Receptacles. Switch Plates $ 7,000 26 50 00 Lighting Installation
Entities connected to both Oliver Stone and Bath Fixtures
California Closets - Allowance
ORGANIZATIONSwitch Plates
ORGANIZATIONCNY Construction Management, Inc.
ORGANIZATIONGeneral Contractors / Construction Managers
ORGANIZATIONTerrace Decking
ORGANIZATIONArchitectural Woodwork
ORGANIZATIONCloset Doors - Allowance
ORGANIZATIONPlaster and Gypsum Board
ORGANIZATIONParquet Floors
ORGANIZATIONSlone Camtettap
PERSONIIVAC
ORGANIZATIONINWPAL
ORGANIZATIONCatena Carty
ORGANIZATIONOPENINGS
ORGANIZATION