8
Shared Docs
8
Same-Page
8 / 8
Mentions
ket removed. Please see attached photo. *A-3 5. Stone threshold to be built between pillars by Dec 5.
ered & expected in STT by Dec 5. Cost of each is $6,825. 12/5 NANNA 4 Stroke Engines JE advised to wait until Jan. On hold Upgrade and Repairs Nanna is in the water. Requires minor electrical upgrade to repair the wires to the radar & horns. In progress. Cabin area broken/fiberglass cracked for
xxi) Has been widened for safety. + Update 29. Stone work on Road Sides xxxii) Complete 16 EFTA0057
g is subject to JE approval. + Update 19. Tiles for Beach Hut xxiii) Will be installed by April 25th. + Update + Update > Update 20. Seamore, Nanna, Fat Cat & Lady G2 xxiv) Nanna - Is operational. Fat Cat — Strengthening of bulkhead and interior is currently being worked on. Yamaha are not go
xxi) Has been widened for safety. + Update 29. Stone work on Road Sides xxxii) Complete 16 EFTA0057
aping is subject to JE approval. + Update 19. Tiles for Beach Hut xxiii) Will be installed by April 25th. + Update + Update f•Itc, 20. Seamore, Nanna, Fat Cat & Lady G2 xxiv) Nanna - Is operational. Fat Cat — Strengthening of bulkhead and interior is currently being worked on. Yamaha are not go
h Road xxxvi. Linked to item 22. + Update 32. Stone work on Road Sides xxxvii. Complete 20 EFTA00
into confirmed they ordered the incorrect tiles. New tiles are now on order and expected first week of March. 28. Update 28. Update 20. Seamore, Nanna, Fat Cat & Lady G2 xxiv. Nanna - Is operational. Some cosmetic work remains but should be completed today. Fat Cat — is in St Thomas. Boscoe is
beque tile work Landscaping behind master suite Stone wall in progress in area behind master suite Flo
ea behind master suite Floating dock Master suite bedroom preparation Master suite tub area and water closet floor progress Outdoor tub progress Nanna paintwork progress Additional boulders collected for the entry way wall project Respectfully submitted, Daphne EFTA00698825
uto start from Kite House 6. Berm/Top of Hill - Stone threshold needs total re-do — must be level and s
ing/replace rotten wood required 33. LSJ Mooring — Darren will forward to Army Corp for final approval — 7/12 34. AYH Dock — re-sanding/staining of Nanna dock - COMPLETE 35. Main Compound Cistern — Demo work complete - confirmed multi leaks - repair work required 36 Hangar - Jermaine to redo interne
restock expected by 8/10 6. Berm/Top of Hill - Stone threshold needs total re-do — must be level and s
ing/replace rotten wood required 33. LSJ Mooring — Darren will forward to Army Corp for final approval — 7/12 34. AYH Dock — re-sanding/staining of Nanna dock - COMPLETE 35. Main Compound Cistern — Demo work complete - confirmed multi leaks - repairs COMPLETE 36 Hangar - Jermaine to redo internet at
dor for status on restock 6. Berm/Top of Hill - Stone threshold needs total re-do — must be level and s
ing/replace rotten wood required 33. LSJ Mooring — Darren will forward to Army Corp for final approval — 7/12 34. AYH Dock — re-sanding/staining of Nanna dock - COMPLETE 35. Main Compound Cistern — Demo work complete - confirmed multi leaks - repair work required 36 Hangar - Jermaine to redo interne
Entities connected to both Oliver Stone and Nanna

Jeffrey Epstein
PERSON
Marc Rich
PERSONLeon Black
PERSON
George W. Bush
PERSON
Richard Kahn
PERSON
Ghislaine Maxwell
PERSON
Alan Dershowitz
PERSON
Prince Charles
PERSON
Alfredo Rodriguez
PERSONDoug Band
PERSON
Samantha Power
PERSON
Eric Trump
PERSON
Condoleezza Rice
PERSONMaria Farmer
PERSONDarren Indyke
PERSONAnn Rodriquez
PERSON
Carlos
PERSONDaphne Wallace
PERSON
William Barr
PERSON
Robert Gates
PERSON