From: Daphne Wallace To: Jeffrey Epstein <[email protected]> Cc: Gary Kerne Subject: Photographs - January 28, 2011 Date: Fri, 28 Jan 2011 21:44:07 +0000 Attachments: Roof and_walkway_painting.JPG; Roof and_walkway_painting_(2).JPG; Roof and_walkway_painting_(3).JPG; Barbeque_tilework.JPG; Kitchen_terrace_tile_work.JPG; Kitchen_terrace_tile_work_(2).JPG; Landscaping_behind_master_suite.JPG; Landscaping_behind_master suite_(2).JPG; Wall in area behind master suite.JPG; Wall_in_area_behind_master suite_(2).JPG; Floating_dock.JPG; Floating_dock_(2).JPG; Floating_dock_(3).JPG; Floating_dock_(4).JPG; Floating_dock_(5).JPG; Floating_dock_(6).JPG; Master_suite_bedroom.JPG; Master_suite_bedroom_(2).JPG; Master_suite_bedroom_(3).JPG; Tub_area_floor_vamishing.JPG; Tub_area_floor_vamishing_(2).JPG; Tub_area_floor_vamishing_(3).JPG; Tub_area_floor_vamishing_(4).JPG; Tub_area_floor_vamishing_(5).JPG; Floor_vamishing_in_water closet.JPG; Outdoor_tub_progress.JPG; Outdoor tub_progress_(2).JPG; Nanna_paint_primer_applied.JPG; Additional_boulders_for entry_way_wall_project.JPG; Additional_boulders_for entry_way_wall_project_(2).JPG; Additional_boulders_for entry_way_wall_project_(3).JPG; Additional boulders_for entry_way_wall_project_(4).JPG Greetings Mr. Epstein, Ion will paint samples of brown trim for would like applied. Is this okay? office so you can choose on your next visit which one you Photographs of January 28, 2011 for your review and comments: Roof and walkway painting progress Kitchen terrace and barbeque tile work Landscaping behind master suite Stone wall in progress in area behind master suite Floating dock Master suite bedroom preparation Master suite tub area and water closet floor progress Outdoor tub progress Nanna paintwork progress Additional boulders collected for the entry way wall project Respectfully submitted, Daphne EFTA00698825

