Forms stripped 2. Stairs formed and poured. 3. Stone veneer S0% done 4. New road at grade for approva
00600290 LLCI. LIVILWOPIP•a 1. Generators in place 2. Switch gear in place 3. Fuel piping underway 4. Fire system complete DESAL BUILDING 1. Backfill continuing 2. Second storey wall standing 3. Top slab Ya formed LIBRARY 1. Remove furniture/francilli working BEACH 1. Deck poured ready for ti
lumbing tbd Contractor • Mike Mike 70 Larger Stone Apron Front tbd Contractor Use new Carmix 71
ction JPK 33 Furniture Package to order 34 Sign Offs Kyle 35 36 GSJ Mai House Septic Tank Finish 37. Installation of New System Adam Cook Backfill 38 Demolition Of Oki Sysytem Adam Cook Page 1 of 5 EFTA00807895 Project Name End Assigned To: I Notes 39 40 41 42 43 Site Wont! Sign
Forms stripped 2. Stairs formed and poured. 3. Stone veneer 50% done 4. New road at grade for approva
00583514 ELECTRICAL BUILDING 1. Generators in place 2. Switch gear in place 3. Fuel piping underway 4. Fire system complete DESAL BUILDING 1. Backfill continuing 2. Second storey wall standing 3. Top slab 'A formed LIBRARY 1. Remove furniture/francilli working BEACH 1. Deck poured ready for ti
Entities connected to both Oliver Stone and Backfill

Jeffrey Epstein
PERSON
Marc Rich
PERSON
Stephen Hawking
PERSON
Condoleezza Rice
PERSON
Georgina Chapman
PERSONMain House
ORGANIZATIONGensler
PERSONNew Albany
LOCATIONThassos
LOCATION