pull, fusing and termination 9/28 — Jermaine completed reprogramming of switches and phone connection 10/1 - COMPLETE 5. Grotto - Mattress cover — JE approved buying fabric, making cover locally, will have fabric by 9/23 - Electronic Remote Starter, auto start from Kite House — completed 9/25 6.
e cleaning 3 days/2 pers $720.00 supervised by Carlos — approved JE - doors/windows in progress — complete by 9/29 - cylinders/boxes in PR — EDA on STT 10/5 EFTA00522072 - Little C — back in operation 9/20 - COMPLETE 14. AC - Set all air conditioning to 80 degrees EXCEPT gym, guest rooms, and storage
possible mural work - Fiber work/Phone — COMPLETE —Jermaine to provide estimates for "fiber secure box" inside 5 Palms 5. Grotto - Mattress cover —JE approved buying fabric — fabric ordered — due on site 10/5 6. Berm/Top of Hill - Hydroseed outside — in progress 7. Triangle - Must design triang
$720.00 supervised by Carlos, after final completion of work — approved JE - doors/windows in progress — Complete - cylinders/boxes in PR — EDA on STT 10/5 EFTA00522078 14. AC - Set all air conditioning to 80 degrees EXCEPT gym, guest rooms, and storage areas — they remain at 85 degrees 15. Transient
-pull, fusing and termination 9/28 — Jermaine completed reprogramming of switches and phone connection 10/1 - COMPLETE 5. Grotto - Mattress cover —JE approved buying fabric, making cover locally, will have fabric by 9/23 - Electronic Remote Starter, auto start from Kite House — completed 9/25 6.
e cleaning 3 days/2 pers $720.00 supervised by Carlos — approved JE - doors/windows in progress — complete by 9/29 - cylinders/boxes in PR — EDA on STT 10/5 EFTA_R1_01210395 EFTA02315485 - Little C — back in operation 9/20 - COMPLETE 14. AC - Set all air conditioning to 80 degrees EXCEPT gym, guest r
possible mural work - Fiber work/Phone — COMPLETE —Jermaine to provide estimates for "fiber secure box" inside 5 Palms 5. Grotto - Mattress cover —JE approved buying fabric — fabric ordered — due on site 10/5 6. Berm/Top of Hill - Hydroseed outside — in progress 7. Triangle - Must design triang
$720.00 supervised by Carlos, after final completion of work — approved JE - doors/windows in progress — Complete - cylinders/boxes in PR — EDA on STT 10/5 EFTA_R1_01214945 EFTA02316357 14. AC - Set all air conditioning to 80 degrees EXCEPT gym, guest rooms, and storage areas — they remain at 85 degr
Entities connected to both Jeffrey Epstein and STT 10/5

Marc Rich
PERSONDarren Indyke
PERSONLeon Black
PERSON
Condoleezza Rice
PERSONCecile de Jongh
PERSONJermaine Ruan
PERSONRichard Barnett
PERSON
Samantha Power
PERSON
Carlos
PERSON
Oliver Stone
PERSONLandscaping
PERSONSubbase
ORGANIZATIONBuck Steel
ORGANIZATIONDarren & Rich
ORGANIZATIONJohn Deere
PERSONChillax Bathroom
PERSONGerry & TJ
ORGANIZATIONBlack Heli
LOCATIONMechanical Building Transformer
ORGANIZATIONCOMPLETE - JE
ORGANIZATION