UNIVERSAL AVIONICS CORP.
ORGANIZATIONTHE STATIC LOADING OF THE INSTALLED EQUIPMENT MEETS THE REQUIREMENTS OF AC
ORGANIZATION3
Shared Docs
3
Same-Page
3 / 3
Mentions
FORM 8110-3, DATED 05/29O001 BY SYSTEMS AND EQUIPMENT DER NO. DEBT-510087-NM. THE NEW EQUIPMENT AND ASSOCIATED SYSTEMS WERE FUNCTIONALLY TESTED PER UNIVERSAL AVIONICS CORP. RETURN TO SERVICE MAINTENANCE AND CHECKOUT PROCEDURES MANUAL NO. 34-60-21, DATED 19 MARCH 2001 WITH NO DISCREPANCIES NOTED. AN EMI TEST, REPORT NO
CHECKED FOR ACCURACY AND COMPENSATED AS NECESSARY PER AC 43.13-IB, CHAPTER 12, SECTION 3, PARAGRAPH 12- 37 AND AC 43.13-2A, CHAPTER 2 PARAGRAPH 234 THE STATIC LOADING OF THE INSTALLED EQUIPMENT MEETS THE REQUIREMENTS OF AC 43.I3-2A. CHAPTER 1. PARAGRAPH 3 AND WAS FOUND TO MEET THE REQUIREMENTS OF PARAGRAPH 2. MATERIALS AND PRACTICES COMPLY WITH PARAGRAPHS 4 THROUGH 12
T MANAGEMENT SYSTEM. REFERENCE F.A.A. FORM 8110-3 DATED 4/19/02 BY SYSTEMS AND EQUIPMENT DER NO. DERT510087-NM. ACCOMPLISHED OPERATIONAL CHECKS PER UNIVERSAL AVIONICS CORP. RETURN TO SERVICE MAINTENANCE AND CHECKOUT PROCEDURES MANUAL NO. 34-60-21, DATED 19 MARCH 2001 WITH NO DISCREPANCIES NOTED. AN EMI TEST, REPORT NO.
CHECKED FOR ACCURACY AND COMPENSATED AS NECESSARY PER AC 43.13-1B, CHAPTER 12, SECTION 3, PARAGRAPH 12- 37 AND AC 43.13-2A, CHAPTER 2 PARAGRAPH 23f. THE STATIC LOADING OF THE INSTALLED EQUIPMENT MEETS THE REQUIREMENTS OF AC 43.13-2A, CHAPTER 1, PARAGRAPH 3 AND WAS FOUND TO MEET THE REQUIREMENTS OF PARAGRAPH 2. MATERIALS AND PRACTICES COMPLY WITH PARAGRAPHS 4 THROUGH 12
NCE DEPT. FAX: (561) 233-7279 wnwjetaviation.com EFTA00278225 • - I. EFTA00278226 JET fIVINTAIDIII DESCRIPTION AND SUBSTANTIATION FOR THE UNIVERSAL AVIONICS CORP. DUAL UNS-1D FLIGHT MANAGEMENT SYSTEMS IN THE GULFSTREAM MODEL G-II, G-IIB AND G-III AIRCRAFT Report No: DAS98001 Page 1 of 8 Rev: A March 11,
REPANCIES. AN EMI TEST, REPORT NO.: G2B-20895-080 WAS CONDUCTED AND THE INSTALLED EQUIPMENT DOES NOT INTERFERE WITH ANY OTHER INSTALLED EQUIPMENT. THE STATIC LOADING OF THE INSTALLED EQUIPMENT MEETS THE REQUIREMENTS OF AC 43.13-2A, CHAPTER 1, PARAGRAPH 3 AND WAS FOUND TO MEET THE REQUIREMENTS OF PARAGRAPH 2. MATERIALS AND PRACTICES COMPLY WITH PARAGRAPHS 4 THROUGH 12
Entities connected to both UNIVERSAL AVIONICS CORP. and THE STATIC LOADING OF THE INSTALLED EQUIPMENT MEETS THE REQUIREMENTS OF AC

Samantha Power
PERSONCONDUCTED
ORGANIZATIONthe Federal Aviation Administration
ORGANIZATIONJohn K. Urso
PERSONRegistration Mark
PERSONUNS-1D Flight Management System
ORGANIZATIONCLASSIFICATION(S
ORGANIZATIONServl
LOCATION
HONEYWELL
ORGANIZATION
George W. Bush
PERSONFrequency Management
ORGANIZATIONK Additional Sheets Are Attached
ORGANIZATIONDER Services
ORGANIZATIONManagement Systems
ORGANIZATIONRonald K. Bystrom
PERSONJEGE INC.
ORGANIZATIONDERT-810028-NE
ORGANIZATIONTriple Honeywell Inertial Reference Sensors
ORGANIZATIONLake City
LOCATION
Jeffrey Epstein
PERSON