UNS-1D Flight Management System
ORGANIZATIONTHE STATIC LOADING OF THE INSTALLED EQUIPMENT MEETS THE REQUIREMENTS OF AC
ORGANIZATION3
Shared Docs
3
Same-Page
3 / 3
Mentions
airplane is modified by the installation of a single Eventide Avionics Argus 5000/CE Moving Map Display receiving navigation inputs from the No. 1 UNS-1D Flight Management System (FMS) in accordance with manufacture's Installation Manual No. sop Revision 03.07, dated July 10, 1995 or later approved revision and FAA Form 337,
CHECKED FOR ACCURACY AND COMPENSATED AS NECESSARY PER AC 43.13-IB, CHAPTER 12, SECTION 3, PARAGRAPH 12- 37 AND AC 43.13-2A, CHAPTER 2 PARAGRAPH 234 THE STATIC LOADING OF THE INSTALLED EQUIPMENT MEETS THE REQUIREMENTS OF AC 43.I3-2A. CHAPTER 1. PARAGRAPH 3 AND WAS FOUND TO MEET THE REQUIREMENTS OF PARAGRAPH 2. MATERIALS AND PRACTICES COMPLY WITH PARAGRAPHS 4 THROUGH 12
r the FAA approval of the new flight manual supplement on N908JE under Banyan Air Servive, Avionics Division work order #68062. A. Removed existing UNS-1D Flight Management System (FMS) control display/computer units and routed to the manufacture for upgrade to UNS-1D+. Reinstalled UNS-1D+ FMS CDU computers. System ground che
CHECKED FOR ACCURACY AND COMPENSATED AS NECESSARY PER AC 43.13-1B, CHAPTER 12, SECTION 3, PARAGRAPH 12- 37 AND AC 43.13-2A, CHAPTER 2 PARAGRAPH 23f. THE STATIC LOADING OF THE INSTALLED EQUIPMENT MEETS THE REQUIREMENTS OF AC 43.13-2A, CHAPTER 1, PARAGRAPH 3 AND WAS FOUND TO MEET THE REQUIREMENTS OF PARAGRAPH 2. MATERIALS AND PRACTICES COMPLY WITH PARAGRAPHS 4 THROUGH 12
SW« r..4./rtu,34..• Al 2EA de a4.- Gulfstream sik.d•e!: G1159 (GE) G1159B (GM) G1159A (GBI) Installation of a dual Universal Avionics Systems UNS-1D Flight Management System with Global Positioning System in accordsnr-P with Jet Aviation Associates' Master Drawing List, MDL98001, Rev A, dated March 11, 1999, or later FAA
REPANCIES. AN EMI TEST, REPORT NO.: G2B-20895-080 WAS CONDUCTED AND THE INSTALLED EQUIPMENT DOES NOT INTERFERE WITH ANY OTHER INSTALLED EQUIPMENT. THE STATIC LOADING OF THE INSTALLED EQUIPMENT MEETS THE REQUIREMENTS OF AC 43.13-2A, CHAPTER 1, PARAGRAPH 3 AND WAS FOUND TO MEET THE REQUIREMENTS OF PARAGRAPH 2. MATERIALS AND PRACTICES COMPLY WITH PARAGRAPHS 4 THROUGH 12
Entities connected to both UNS-1D Flight Management System and THE STATIC LOADING OF THE INSTALLED EQUIPMENT MEETS THE REQUIREMENTS OF AC

Samantha Power
PERSONCONDUCTED
ORGANIZATIONthe Federal Aviation Administration
ORGANIZATIONJohn K. Urso
PERSONRegistration Mark
PERSONUNIVERSAL AVIONICS CORP.
ORGANIZATIONCLASSIFICATION(S
ORGANIZATIONServl
LOCATION
HONEYWELL
ORGANIZATION
George W. Bush
PERSONFrequency Management
ORGANIZATIONK Additional Sheets Are Attached
ORGANIZATIONDER Services
ORGANIZATIONManagement Systems
ORGANIZATIONRonald K. Bystrom
PERSONJEGE INC.
ORGANIZATIONDERT-810028-NE
ORGANIZATIONTriple Honeywell Inertial Reference Sensors
ORGANIZATIONLake City
LOCATION
Jeffrey Epstein
PERSON