DER Services
ORGANIZATIONTHE STATIC LOADING OF THE INSTALLED EQUIPMENT MEETS THE REQUIREMENTS OF AC
ORGANIZATION3
Shared Docs
3
Same-Page
3 / 3
Mentions
oved 2) This approval is valid for the aircraft model and serial number listed below 3) This approval is based on structural analysis on file at DER Services corporate office in Ft. Lauderdale, TV. Model No. B727-3I Serial No. 20115 PURPOSE Approve data for antenna installation (Structures Only) OF
CHECKED FOR ACCURACY AND COMPENSATED AS NECESSARY PER AC 43.13-IB, CHAPTER 12, SECTION 3, PARAGRAPH 12- 37 AND AC 43.13-2A, CHAPTER 2 PARAGRAPH 234 THE STATIC LOADING OF THE INSTALLED EQUIPMENT MEETS THE REQUIREMENTS OF AC 43.I3-2A. CHAPTER 1. PARAGRAPH 3 AND WAS FOUND TO MEET THE REQUIREMENTS OF PARAGRAPH 2. MATERIALS AND PRACTICES COMPLY WITH PARAGRAPHS 4 THROUGH 12
ice; Avionics Division work order #71301 completed on October 4, 2006. A. Installed an AirCell Iridium Antenna P/N S67-1575-109 in accordance with DER Services drawing number 2006-173-1 approved per FAA form 8130-3 signed by Robert Belgau DERT designation number DERT-510024-CE. The above installation was
CHECKED FOR ACCURACY AND COMPENSATED AS NECESSARY PER AC 43.13-1B, CHAPTER 12, SECTION 3, PARAGRAPH 12- 37 AND AC 43.13-2A, CHAPTER 2 PARAGRAPH 23f. THE STATIC LOADING OF THE INSTALLED EQUIPMENT MEETS THE REQUIREMENTS OF AC 43.13-2A, CHAPTER 1, PARAGRAPH 3 AND WAS FOUND TO MEET THE REQUIREMENTS OF PARAGRAPH 2. MATERIALS AND PRACTICES COMPLY WITH PARAGRAPHS 4 THROUGH 12
2. aspects only of the above listed data are approved is valid for the aircraft model and serial number is based on structural analysis on file at DER Services office in Ft. Lauderdale, FL. No. B727-31 Serial No. 20115 1) The structural herein. 2) This approval listed below 3) This approval cor
CHECKED FOR ACCURACY AND COMPENSATED AS NECESSARY PER AC 43.13-1B, CHAPTER 12, SECTION 3, PARAGRAPH 12- 37 AND AC 43.13-2A, CHAPTER 2 PARAGRAPH 23f. THE STATIC LOADING OF THE INSTALLED EQUIPMENT MEETS THE REQUIREMENTS OF AC 43.13-2A, CHAPTER 1, PARAGRAPH 3 AND WAS FOUND TO MEET THE REQUIREMENTS OF PARAGRAPH 2. MATERIALS AND PRACTICES COMPLY WITH PARAGRAPHS 4 THROUGH•12
Entities connected to both DER Services and THE STATIC LOADING OF THE INSTALLED EQUIPMENT MEETS THE REQUIREMENTS OF AC
CONDUCTED
ORGANIZATIONRegistration Mark
PERSONJohn K. Urso
PERSONthe Federal Aviation Administration
ORGANIZATION
Samantha Power
PERSONDERT-810028-NE
ORGANIZATIONJEGE INC.
ORGANIZATIONTriple Honeywell Inertial Reference Sensors
ORGANIZATIONLake City
LOCATION
George W. Bush
PERSONFrequency Management
ORGANIZATIONManagement Systems
ORGANIZATIONCLASSIFICATION(S
ORGANIZATION
HONEYWELL
ORGANIZATIONServl
LOCATIONUNS-1D Flight Management System
ORGANIZATIONRonald K. Bystrom
PERSONLee Wagener Blvd
PERSON& Equipment Aspects
ORGANIZATIONL. Palm
PERSON