5
Shared Docs
5
Same-Page
5 / 5
Mentions
. Engineering — start emptying/relocating items in remaining 20 foot containers 10/9 30. Stone Walls — Repair work to replace missing loose stones — Gerry & TJ — Danny to schedule them 31. Part Time Employees — a forwarded information of 2 potential part-time housekeepers to 9/25 — to schedule meeting wi
10/10 - Picture frame — measurements forwarded tom- 86 x 70 - Mirrored siding — will continue to reglue — possible mural work - Piano — retuned — Patrick Baron — 9/18 - COMPLETE - Transformer shed — painting completed and door installed 9/18 - COMPLETE - Fiber work — $2,956.25 quote approved — Liston Netwo
. Engineering — start emptying/relocating items in remaining 20 foot containers 10/9 30. Stone Walls — Repair work to replace missing loose stones — Gerry & TJ — Danny to schedule them 31. Part Time Employees —Anna forwarded information of 2 potential part-time housekeepers to Karen 9/25 — Karen to schedul
- Picture frame — measurements forwarded to Sarah - 86 x 70 - Mirrored siding — will continue to reglue — possible mural work - Piano — retuned — Patrick Baron — 9/18 - COMPLETE - Transformer shed — painting completed and door installed 9/18 - COMPLETE - Fiber work — $2,956.25 quote approved — Liston Netwo
locating items in remaining 20 foot containers — 2 emptied and leaving LSJ on 10/18 28. Stone Walls — Repair work to replace missing loose stones — Gerry & TJ — Danny to schedule them EFTA00522076 29. Part Time Employees —focus on finding maids — Karen met with the two applicants on 10/2 — one (Mercedes)
ng — will continue to reglue — possible mural work - Fiber work/Phone — COMPLETE — "fiber secure box" inside 5 Palms - COMPLETE - Piano re-tuning — Patrick Baron 10/20 5. Grotto - Mattress cover —JE approved buying fabric — fabric on site 6. Berm/Top of Hill - Hydroseed outside — in progress - Reseed all
locating items in remaining 20 foot containers — 2 emptied and leaving LSJ on 10/18 28. Stone Walls — Repair work to replace missing loose stones — Gerry & TJ — Danny to schedule them EFTA00556193 29. Part Time Employees —focus on finding maids — Karen met with the two applicants on 10/2 — one (Mercedes)
ng — will continue to reglue — possible mural work - Fiber work/Phone — COMPLETE — "fiber secure box" inside 5 Palms - COMPLETE - Piano re-tuning — Patrick Baron 10/20 5. Grotto - Mattress cover —JE approved buying fabric — fabric on site 6. Berm/Top of Hill - Hydroseed outside — in progress - Reseed all
s — 2 off site 10/18, 3'd leaving LSJ 10/20. RO & Generators in remaining container 27. Stone Walls — Repair work to replace missing loose stones — Gerry & TJ 28. Part Time Employees — focus on finding housekeepers — have interviewed 6 more applicants, Anna has made contact with 4 additional applicants, a
l frame locally - Mirrored siding — 3 more sections have fallen off, will continue to reglue if possible — new sections ordered - Piano re-tuning — Patrick Baron 10/20 4. Grotto - Mattress cover — completion expected 10/30 5. Berm/Top of Hill - Hydroseed all top of hill/berm — COMPLETE - rain continues to
Entities connected to both Gerry & TJ and Patrick Baron

Jeffrey Epstein
PERSON
Marc Rich
PERSONLeon Black
PERSON
Oliver Stone
PERSONJohn Deere
PERSONDarren Indyke
PERSON
Condoleezza Rice
PERSONRichard Barnett
PERSONBuck Steel
ORGANIZATIONMechanical Building Transformer
ORGANIZATIONBlack Heli
LOCATIONLandscaping
PERSON
Samantha Power
PERSONCOMPLETE - JE
ORGANIZATIONCecile de Jongh
PERSONChillax Bathroom
PERSON
Carlos
PERSONLal — Peter
PERSONKaren
PERSONJermaine Ruan
PERSON