8
Shared Docs
8
Same-Page
8 / 8
Mentions
uck Steel drawings on site. Shed ordered, will schedule removal of existing bolts patterns and installation of new 24. PEiU dixPti' Tindoe r - (3) Terex RL-4000 6kW Light Tower systems — at Tropical, sailing 10/31 - (1) Skid steer forks —per Jack to Tropical by 10/30 - (1) 2012 John Deere 5101E trac
e 10/20. RO & Generators in remaining container, will be removed once Lull repaired 27. Stone Walls — Repair work to replace missing loose stones — Gerry & TJ working as time permits 28. Part Time Employees — focus on finding housekeepers — have a potential candidate, working the next week. Interviewing 2
ed to approve layout will forward 11/14 - Installation of new bolts — David. Due on site 11/14 25. Equipment/Household Purchase and Delivery - (3) Terex RL-4000 6kW Light Tower systems — 2 on site, 1 remaining to be picked up 11/16 - (1) 2012 John Deere 5101E tractor with 553 loader and 8' blade — ET
ff site. RO & Generators in remaining container, will be removed once Lull repaired 27. Stone Walls — Repair work to replace missing loose stones — Gerry & TJ working as time permits - Complete Heli Pad Wall — sub contractor forwarded bid 11/12 scope of work & more details required, awaiting revised bid
forwarded to Buck Steel, will follow up this week - Installation of new bolts — 80% complete 25. Equipment/Household Purchase and Delivery - (3) Terex RL-4000 6kW Light Tower systems — on site - (1) 2012 John Deere 5101E tractor with 553 loader and 8' blade — on site - (1) 2003 Genie Z60/34 Boom l
ff site. RO & Generators in remaining container, will be removed once Lull repaired 27. Stone Walls — Repair work to replace missing loose stones — Gerry & TJ working as time permits - Complete Heli Pad Wall — 2 bids from sub contractors, will forward next week 28. Part Time Housekeepers — trail period fo
Buck Steel drawings on site. Shed ordered, will schedule removal of existing bolts patterns and installation of new 24. Equipment Purchased - (3) Terex RL-4000 6kW Light Tower systems — delivery to Tropical by 10/29 - (1) Skid steer forks — awaiting delivery to Tropical - (1) 2012 John Deere 5101E
e 10/20. RO & Generators in remaining container, will be removed once Lull repaired 27. Stone Walls — Repair work to replace missing loose stones — Gerry & TJ working as time permits 28. Part Time Employees — focus on finding housekeepers — have a potential candidate, working the next week. Interviewing 2
el cost out the price for a new shed also requesting cost of removal of existing bolt pattern & epoxy in new anchors 24. Equipment Purchased - (3) Terex RL-4000 6kW Light Tower systems — delivery to Tropical by 10/29 - (1) Skid steer forks — awaiting delivery to Tropical - (1) 2012 John Deere 5101E
e 10/20. RO & Generators in remaining container, will be removed once Lull repaired 27. Stone Walls — Repair work to replace missing loose stones — Gerry & TJ working as time permits 28. Part Time Employees — focus on finding housekeepers — have a potential candidate, working the next week. Interviewing 2
12/4, booked to sail 12/7 - Removal of existing bolts patterns & installation of new - David (carpenter) 23. Equipment Purchase and Delivery - (3) Terex RL-4000 6kW Light Tower systems — at Tropical, sailing 10/31, EDA on STT 11/3 - (1) Skid steer forks — due to arrive at Tropical 10/31 - (1) 2012 J
off site. RO & Generators in remaining container, will be removed once Lull repaired 26. Stone Walls — Repair work to replace missing loose stones — Gerry & TJ working as time permits 27. Part Time Employees —focus on finding housekeepers — have a potential candidate, working the next week. Employment Comp
k Steel drawings on site. Shed ordered. Removal of existing bolts patterns & installation of new - David (carpenter) 24. Equipment Purchased - (3) Terex RL-4000 6kW Light Tower systems — due to arrive at Tropical 10/31 - (1) Skid steer forks — due to arrive at Tropical 10/31 - (1) 2012 John Deere 51
off site. RO & Generators in remaining container, will be removed once Lull repaired 27. Stone Walls — Repair work to replace missing loose stones — Gerry & TJ working as time permits 28. Part Time Employees — focus on finding housekeepers — have a potential candidate, working the next week. Employment Com
). 23. Steel shed — Buck Steel drawings on site. Shed ordered, will schedule removal of existing bolts patterns and installation of new 24. - (3) Terex RL-4000 6kW Light Tower systems — at Tropical, sailing 10/31 - (1) Skid steer forks -per Jack to Tropical by 10/30 - (1) 2012 John Deere 5101E trac
e 10/20. RO & Generators in remaining container, will be removed once Lull repaired 27. Stone Walls — Repair work to replace missing loose stones — Gerry & TJ working as time permits 28. Part Time Employees — focus on finding housekeepers — have a potential candidate, working the next week. Interviewing 2
Entities connected to both Terex and Gerry & TJ

Jeffrey Epstein
PERSON
Marc Rich
PERSONJohn Deere
PERSONLeon Black
PERSON
Oliver Stone
PERSONRichard Barnett
PERSON
Condoleezza Rice
PERSONLandscaping
PERSONDarren Indyke
PERSONBuck Steel
ORGANIZATIONBlack Heli
LOCATIONCecile de Jongh
PERSON
Samantha Power
PERSONRO & Generators
ORGANIZATIONMechanical Building Transformer
ORGANIZATIONNanny Cay
LOCATION
Genie
PERSONMini Excavator
ORGANIZATIONCOMPLETE - JE
ORGANIZATIONArmy Corp 10/17
ORGANIZATION