3
Shared Docs
3
Same-Page
3 / 3
Mentions
sition after meeting with Mr. Epstein. $1,180.00 plus tax Total $1,262.00 Final total $ 3,383.00 Call me if you have any questions at Thank you, JJ Blea EFTA00731690 Managing Member EFTA00731691
Three B's LLC 4600 Lincoln rd. NE Albuquerque, NM 87109 Lic.# 83498 Invoice Brice Gordon do Zorro Ranch Stanley, New Mexico Brice, Here is the price for lowering the fount
ght. Material 400.00 Equipment rental 1200.00 Labor 2030.00 Tax 253.00 Final total $ 3,883.50 Call me if you have any questions at Thank you, JJ Blea EFTA00731689
Three B's LLC 4600 Lincoln rd. NE Albuquerque, NM 87109 Lic.# 83498 Invoice Zorro Ranch Stanley, New Mexico 06 October, 2010 Phase 1 8/18/2010 Support fountain bowl with
ications or alterations to the gutter system. We can start Monday September 24th Please call me if you have any questions at 450-3654. Thank you, JJ Blea EFTA00585297
3B's LLC 4600 Lincoln rd. NE Albuq 109 Brice, Here is a price to remove the limestone and concrete for the terraces. Balistre removed and reinstalled. Remove existing l
Entities connected to both JJ Blea and Lincoln rd