Three B's LLC 4600 Lincoln rd. NE Albuquerque, NM 87109 Lic.# 83498 Invoice Brice Gordon do Zorro Ranch Stanley, New Mexico Brice, Here is the price for lowering the fountain in the Estancia Phase 1 Support fountain bowl with I-beams and heavy duty material lifts (4) Saw cut grout joint Raise bowl and remove middle piece of fountain Lower bowl and set into place for owner to approve Phase 2 Support fountain bowl with I-beams and heavy duty material lifts (4) Raise fountain and apply grout Lower fountain and level Fill bowl to check for uniformity of water flow around the perimeter of bowl. Some grinding may need to be done to achieve water flow. Project should take about 3 day's total Includes; material, labor, equipment to complete project Excludes; electrical and plumbing Price $ 2,450.00 plus tax Total $ 2,621.50 **We had additional labor, materials and equipment rentals to lower the bowl to its final position after meeting with Mr. Epstein. $1,180.00 plus tax Total $1,262.00 Final total $ 3,383.00 Call me if you have any questions at Thank you, JJ Blea EFTA00731690
Managing Member EFTA00731691




