10
Shared Docs
10
Same-Page
10 / 10
Mentions
on placement required 10. Chillax Room — Requires furniture piece for electrical/media equipment, review pieces that are stored in PBI — Sarah 11. Chillax Bathroom - require blue rugs for bathroom & vanity area — 12. Mechanical Building Transformer —on LSJ 9/22 13. Boats - Lady G — sell — in hurricane storag
. Engineering — start emptying/relocating items in remaining 20 foot containers 10/9 30. Stone Walls — Repair work to replace missing loose stones — Gerry & TJ — Danny to schedule them 31. Part Time Employees — a forwarded information of 2 potential part-time housekeepers to 9/25 — to schedule meeting wi
— Requires furniture piece for electrical/media equipment, reviewing pieces that are stored in PBI, which do not work, to review other options 11. Chillax Bathroom - require blue rugs for bathroom & vanity area -- 12. Mechanical Building Transformer — on site — to be removed off pallet 10/4, then review install
Engineering — start emptying/relocating items in remaining 20 foot containers 10/15 28. Stone Walls — Repair work to replace missing loose stones — Gerry & TJ — Danny to schedule them 29. Part Time Employees —M forwarded information of 2 potential part-time housekeepers to 9/25 — to schedule meeting with
bases on existing boxes 10. Chillax Room — Requires furniture piece for electrical/media equipment - Sarah forwarded another suggestion 11/13 11. Chillax Bathroom - Walls in vanity area to be painted —JE to select color/style. - Install Robe Hook on bathroom door —require location/height. Sarah has ordered co
ff site. RO & Generators in remaining container, will be removed once Lull repaired 27. Stone Walls — Repair work to replace missing loose stones — Gerry & TJ working as time permits - Complete Heli Pad Wall — sub contractor forwarded bid 11/12 scope of work & more details required, awaiting revised bid
Dec 9. Dock Boxes - David will fabricate a lighter lid — in production 10. Chillax Room - Media Center - ordered — shipped to Tropical 11/19 11. Chillax Bathroom - Lower wall in bathroom to be painted same color as trim - complete - Install Robe Hook on bathroom door —require location/height. Sarah has order
ff site. RO & Generators in remaining container, will be removed once Lull repaired 27. Stone Walls — Repair work to replace missing loose stones — Gerry & TJ working as time permits - Complete Heli Pad Wall — 2 bids from sub contractors, will forward next week 28. Part Time Housekeepers — trail period fo
on placement required 10. Chillax Room — Requires furniture piece for electrical/media equipment, review pieces that are stored in PBI — Sarah 11. Chillax Bathroom - require blue rugs for bathroom & vanity area — Sarah 12. Mechanical Building Transformer —on LSJ 9/22 13. Boats - Lady G — sell — in hurricane
. Engineering — start emptying/relocating items in remaining 20 foot containers 10/9 30. Stone Walls — Repair work to replace missing loose stones — Gerry & TJ — Danny to schedule them 31. Part Time Employees —Anna forwarded information of 2 potential part-time housekeepers to Karen 9/25 — Karen to schedul
uires furniture piece for electrical/media equipment, reviewing pieces that are stored in PBI, which do not work, Sarah to review other options 11. Chillax Bathroom - require blue rugs for bathroom & vanity area — Sarah 12. Mechanical Building Transformer — on site —Danny to receive bid for removal and installa
locating items in remaining 20 foot containers — 2 emptied and leaving LSJ on 10/18 28. Stone Walls — Repair work to replace missing loose stones — Gerry & TJ — Danny to schedule them EFTA00522076 29. Part Time Employees —focus on finding maids — Karen met with the two applicants on 10/2 — one (Mercedes)
floating dock — "rubberized material" 10. Chillax Room — Requires furniture piece for electrical/media equipment — suggestions forwarded 10/4 11. Chillax Bathroom - require blue rugs for bathroom & vanity area — Sarah 12. Mechanical Building Transformer — on site, off pallet, reviewing installation options 1
Engineering — start emptying/relocating items in remaining 20 foot containers 10/05 28. Stone Walls — Repair work to replace missing loose stones — Gerry & TJ — Danny to schedule them 29. Part Time Employees — Anna forwarded information of 2 potential part-time housekeepers to Karen. Neither fits the requ
— Requires furniture piece for electrical/media equipment, reviewing pieces that are stored in PBI, which do not work, to review other options 11. Chillax Bathroom - require blue rugs for bathroom & vanity area — 12. Mechanical Building Transformer — on site — to be removed off pallet 10/4, then review install
Engineering — start emptying/relocating items in remaining 20 foot containers 10/15 28. Stone Walls — Repair work to replace missing loose stones — Gerry & TJ — Danny to schedule them 29. Part Time Employees —= forwarded information of 2 potential part-time housekeepers to 9/25 — to schedule meeting with
uires furniture piece for electrical/media equipment, reviewing pieces that are stored in PBI, which do not work, Sarah to review other options 11. Chillax Bathroom - require blue rugs for bathroom & vanity area — Sarah 12. Mechanical Building Transformer — on site —Danny to receive bid for removal and installa
locating items in remaining 20 foot containers — 2 emptied and leaving LSJ on 10/18 28. Stone Walls — Repair work to replace missing loose stones — Gerry & TJ — Danny to schedule them EFTA00556193 29. Part Time Employees —focus on finding maids — Karen met with the two applicants on 10/2 — one (Mercedes)
nt required - Dive Platform — require construction details 10. Chillax Room — requires furniture piece for electrical/media equipment — Sarah 11. Chillax Bathroom - require blue rugs for bathroom & vanity area — Sarah 12. Mechanical Building Transformer — at Tropical FL 8/31 13. Boats - Lady G — sell — in h
ons to be ordered 9/4 32. Engineering — Old Building roof to be painted start — 9/4 33. Stone Walls — Repair work to replace missing loose stones — Gerry & TJ - to start 9/10 34. Solar Lights — installation to continue, placement via 1E's direction EFTA00584519
Entities connected to both Chillax Bathroom and Gerry & TJ

Jeffrey Epstein
PERSONDarren Indyke
PERSON
Condoleezza Rice
PERSON
Marc Rich
PERSON
Oliver Stone
PERSONLandscaping
PERSONLeon Black
PERSONJohn Deere
PERSONRichard Barnett
PERSON
Samantha Power
PERSONBuck Steel
ORGANIZATIONBlack Heli
LOCATIONMechanical Building Transformer
ORGANIZATIONCOMPLETE - JE
ORGANIZATIONCecile de Jongh
PERSON
Carlos
PERSONDarren & Rich
ORGANIZATIONNanny Cay
LOCATIONRO & Generators
ORGANIZATIONJermaine Ruan
PERSON