3
Shared Docs
3
Same-Page
3 / 3
Mentions
EEL WORKS 1718000/33 3.71400003 - 1.018630.14 1.1leson, Supply. Erection works of steel beams 2.Design °Nino to be as per local codes 3.Design Uve Load will be 3Kn/San and I Imposed load to be 2K n/sqm 4. light weigh' partition max 1Kn/sqm) 4. Max Floor to floor Height 4.8M 5. Cl deck sheet 6.Sfe
24,931.51 TOTAL CARRIED TO SUMMARY • FLOOR WORKS L FINISHES 8,199,350.00 1 44,479.45 9.00 LIGHTING FIXTURES - 9.01 A SPOT LIGHT • Supply and InstaBallon 7W LED RECESSED SPOMGHT with DIE CAST ALUMINUM BODY and GLASS DIFFUSER MOMS with DAL. confrolled/ 0.10y DIMMABLE LED DRIVER. colour ternperolure W
UCTURE it ROOF WORKS - 2.01 2.02 ROOF STEEL WORKS 1.Design, Supply, Erectionworks of steel beams 2.Desgn Wei° to be as per local codes 3.Design Uve Load will be 3Kn/Sqm and I Imposed load to be 2K nisrarn • light we4ghl postilion max 1Knisqm) 4. Max Floor to floor Height 4.8M 5. GI deck sheet 6.St
0103 24,931.51 TOTAL CARRIED TO SUMMARY • FLOOR WORKS A FINISHES 24H•250O0 684,726.03 TAO LIGHTING FIXTURES - 9.01 A SPOT LIGHT • Supply and InstaBallon 97500 - 7W LED RECESSED SPOPJGHT with DIE CAST ALUMINUM BODY and GLASS DIFFUSER for 1P65 with DAU conholled/ 0.10V DIMMABLE LED DRIVER. cotois l
EEL WORKS 1718000/33 3.71400003 - 1.018630.14 1.1leson, Supply. Erection works of steel beams 2.Design °Nino to be as per local codes 3.Design Uve Load will be 3Kn/San and I Imposed load to be 2K n/sqm 4. light weigh' partition max 1Kn/sqm) 4. Max Floor to floor Height 4.8M 5. Cl deck sheet 6.Sfe
24,931.51 TOTAL CARRIED TO SUMMARY • FLOOR WORKS L FINISHES 8,199,350.00 1 44,479.45 9.00 LIGHTING FIXTURES - 9.01 A SPOT LIGHT • Supply and InstaBallon 7W LED RECESSED SPOMGHT with DIE CAST ALUMINUM BODY and GLASS DIFFUSER MOMS with DAL. confrolled/ 0.10y DIMMABLE LED DRIVER. colour ternperolure W
Entities connected to both Uve Load and InstaBallon
Consrucilon &
ORGANIZATION
Samantha Power
PERSON
Istanbul
LOCATIONSchneider
PERSONJAMES ISLAND
LOCATIONMax Floor
PERSON
Eric Holder
PERSON
Oliver Stone
PERSONPool Maintenance Kit
ORGANIZATIONMONO BASIN MIXER
ORGANIZATIONInslolalion of Concrete
ORGANIZATIONSUMMARY • STEEL STRUCTURE
ORGANIZATIONPVC CO/Iduil
ORGANIZATIONSupply lc Installalion
ORGANIZATIONU NIT PRICE
ORGANIZATIONClaimer
ORGANIZATIONSupply ond installoIon
ORGANIZATIONSupply & kntollolion ot GI
ORGANIZATIONSupply & Instollalion ol Boaboxwith
ORGANIZATIONSupply & tratollalion ot
ORGANIZATION