for the beach lighting of palms around the salt pond and beach — completed 9/20 16. Transient Surge Protection — awaiting arrival at Tropical 17. Landscaping — Peter's List - High road trees - High road waterfall - Line roads with stones - Pop's Garden — need deer protection — Danny suggested install a
- Picture frame — measurements forwarded to Sarah - 86 x 70 - Mirrored siding — will continue to reglue — possible mural work - Piano — retuned — Patrick Baron — 9/18 - COMPLETE - Transformer shed — painting completed and door installed 9/18 - COMPLETE - Fiber work — $2,956.25 quote approved — Liston Netwo
itioning to 80 degrees EXCEPT gym, guest rooms, and storage areas — they remain at 85 degrees 15. Transient Surge Protection — EDA on STT 10/13 16. Landscaping — Peter's List - High road trees - High road waterfall — details required - Line all roads with stones - Pop's Garden — need deer protection — pe
ng — will continue to reglue — possible mural work - Fiber work/Phone — COMPLETE — "fiber secure box" inside 5 Palms - COMPLETE - Piano re-tuning — Patrick Baron 10/20 5. Grotto - Mattress cover —JE approved buying fabric — fabric on site 6. Berm/Top of Hill - Hydroseed outside — in progress - Reseed all
itioning to 80 degrees EXCEPT gym, guest rooms, and storage areas — they remain at 85 degrees 15. Transient Surge Protection — EDA on STT 10/13 16. Landscaping — Peter's List - High road trees - High road waterfall — details required - Line all roads with stones - Pop's Garden — need deer protection — pe
ng — will continue to reglue — possible mural work - Fiber work/Phone — COMPLETE — "fiber secure box" inside 5 Palms - COMPLETE - Piano re-tuning — Patrick Baron 10/20 5. Grotto - Mattress cover —JE approved buying fabric — fabric on site 6. Berm/Top of Hill - Hydroseed outside — in progress - Reseed all
onditioning to 80 degrees EXCEPT gym, guest rooms, and storage areas — they remain at 85 degrees 14. Transient Surge Protection — on site 10/18 15. Landscaping — Peter's List - High road trees - COMPLETE - High road waterfall — rocks to be installed - Line all roads with stones - Pop's Garden — require d
l frame locally - Mirrored siding — 3 more sections have fallen off, will continue to reglue if possible — new sections ordered - Piano re-tuning — Patrick Baron 10/20 4. Grotto - Mattress cover — completion expected 10/30 5. Berm/Top of Hill - Hydroseed all top of hill/berm — COMPLETE - rain continues to
Entities connected to both Landscaping and Patrick Baron

Jeffrey Epstein
PERSON
Condoleezza Rice
PERSON
Marc Rich
PERSONDarren Indyke
PERSON
Oliver Stone
PERSONLeon Black
PERSON
Samantha Power
PERSONJohn Deere
PERSONChillax Bathroom
PERSONRichard Barnett
PERSONBuck Steel
ORGANIZATIONGerry & TJ
ORGANIZATIONBlack Heli
LOCATIONMechanical Building Transformer
ORGANIZATIONCOMPLETE - JE
ORGANIZATION
Carlos
PERSONCecile de Jongh
PERSONJermaine Ruan
PERSONKaren
PERSONLal — Peter
PERSON