eturn items. Awaiting claim forms from Tropical. Per JE direction reordered 11/09 15. Old Floating Dock — Break down and Dispose - begin 11/12 16. Landscaping— Peter's List - Line all Roads with Rocks & Rocks for Waterfall —Top Priority - Beach 3 — cleaned & graded - work to begin 11/14 EFTA_R1_00462783
electric fence — ETA STT 11/14 - David to make planter boxes — in production, 1 complete. - Black Heli Under Pads — install at top of bike path at MC — Installation to begin 1/10 - Sea Grape — contacted PR sourcing prices expected 11/14 - 20 x 15ft Coconut Palms — for engineering area — ordered 11/9 ETA L.5112/
tica/Center Consol — sourcing locally - Purchase New Boat to replace Midnight — require budget 12. AC - Set all air conditioning to 80 degrees 13. Landscaping — Peter's List - Line all Roads with Rocks & Rocks for Waterfall • Rubbish Dump - regrade, berm placement along side road - Transformer area on ba
pproval. - Relocate 2 palms from Salt Pond to edge of the road near transformer at 5 Palms - Black Heli Under Pads — install at top of bike path at MC — Installation to begin 1/10 - Sea Grape/Citrus Fertilizer/Mulch — where to come with Palms from PR — invoice expected week of 11/17 LV to bring sunflower seeds
tica/Center Consol — sourcing locally - Purchase New Boat to replace Midnight — require budget 12. AC - Set all air conditioning to 80 degrees 13. Landscaping — Peter's List - Line all Roads with Rocks & Rocks for Waterfall - Rubbish Dump - regrade, berm placement along side road - Transformer area on ba
pproval. - Relocate 2 palms from Salt Pond to edge of the road near transformer at 5 Palms - Black Heli Under Pads — install at top of bike path at MC — Installation to begin 1/10 - Sea Grape/Citrus Fertilizer/Mulch — where to come with Palms from PR — invoice expected week of 11/17 - LV to bring sunflower seeds
Purchase New Dingy — sourcing locally - Purchase New Boat to replace Midnight — require budget 12. AC - Set all air conditioning to 80 degrees 13. Landscaping — Peter's List - Line all Roads with Rocks & Rocks for Waterfall—? - Rubbish Dump - regrade, berm placement along side road - Transformer area on
pproval. - Relocate 2 palms from Salt Pond to edge of the road near transformer at 5 Palms - Black Heli Under Pads — install at top of bike path at MC — Installation to begin 1/10 - Sea Grape/Citrus Fertilizer/Mulch — where to come with Palms from PR — invoice expected week of 11/17 - 20 x 15ft Coconut Palms fro
14. Transient Surge Protection, Blue Storage Bins & Safety Glasses - - on site 15. Old Floating Dock - - Break down and Dispose - 70% complete 16. Landscaping — Peter's List - Line all Roads with Rocks & Rocks for Waterfall — Top Priority - Beach 3 — cleaned & graded - Rubbish Dump - regrade, bern placem
omplete. - Relocate 2 palms from Salt Pond to edge of the road near transformer at 5 Palms - Black Heli Under Pads — install at top of bike path at MC — Installation to begin 1/10 - Sea Grape/Citrus Fertilizer/Mulch — where to come with Palms from PR? - 20 x 15ft Coconut Palms from PR — installed 17. Roads - G
Entities connected to both Landscaping and MC — Installation

Jeffrey Epstein
PERSON
Condoleezza Rice
PERSON
Marc Rich
PERSON
Oliver Stone
PERSONLeon Black
PERSONChillax Bathroom
PERSONJohn Deere
PERSONNanny Cay
LOCATIONRO & Generators
ORGANIZATIONRichard Barnett
PERSONBuck Steel
ORGANIZATIONMini Excavator
ORGANIZATION
Martha Stewart
PERSON
Genie
PERSONTerex
ORGANIZATIONInstall Robe Hook
PERSONPebble Beach
LOCATIONETA STT
ORGANIZATION
Atlanta
LOCATIONHeli Pad - Wind
ORGANIZATION