s of 9/21) 25. Main compound - Projector Screen — new limit switches and motor required — Danny completed repairs 9/20 - COMPLETE 26. Steel shed — Buck Steel (FL) —JE approved mock-up 9/26, changes 9/27 — Buck Steel working on the final specs and quote 27. Equipment to be Purchased - (1) light generator
10/10 - Picture frame — measurements forwarded tom- 86 x 70 - Mirrored siding — will continue to reglue — possible mural work - Piano — retuned — Patrick Baron — 9/18 - COMPLETE - Transformer shed — painting completed and door installed 9/18 - COMPLETE - Fiber work — $2,956.25 quote approved — Liston Netwo
s of 9/21) 25. Main compound - Projector Screen — new limit switches and motor required — Danny completed repairs 9/20 - COMPLETE 26. Steel shed — Buck Steel (FL) — JE approved mock-up 9/26, changes 9/27 — Buck Steel working on the final specs and quote 27. Equipment to be Purchased - (1) light generato
- Picture frame — measurements forwarded to Sarah - 86 x 70 - Mirrored siding — will continue to reglue — possible mural work - Piano — retuned — Patrick Baron — 9/18 - COMPLETE - Transformer shed — painting completed and door installed 9/18 - COMPLETE - Fiber work — $2,956.25 quote approved — Liston Netwo
outfall down the slope from the pad — architect will send updated plans once the pipe is added — to submit to DPNR for permitting 24. Steel shed — Buck Steel sent out drawings to STT via UPS on 10/12 25. Equipment to be Purchased - (1) Light generator, (2) arms with lights to be hard wired - quote receiv
ng — will continue to reglue — possible mural work - Fiber work/Phone — COMPLETE — "fiber secure box" inside 5 Palms - COMPLETE - Piano re-tuning — Patrick Baron 10/20 5. Grotto - Mattress cover —JE approved buying fabric — fabric on site 6. Berm/Top of Hill - Hydroseed outside — in progress - Reseed all
outfall down the slope from the pad — architect will send updated plans once the pipe is added — to submit to DPNR for permitting 24. Steel shed — Buck Steel sent out drawings to STT via UPS on 10/12 25. Equipment to be Purchased - (1) Light generator, (2) arms with lights to be hard wired - quote receiv
ng — will continue to reglue — possible mural work - Fiber work/Phone — COMPLETE — "fiber secure box" inside 5 Palms - COMPLETE - Piano re-tuning — Patrick Baron 10/20 5. Grotto - Mattress cover —JE approved buying fabric — fabric on site 6. Berm/Top of Hill - Hydroseed outside — in progress - Reseed all
3 copies), with 3 copies forwarded to DPNR & submit copy of plan to VIPA. Drawing Package forwarded to Tom Melnick for a bid 10/18 23. Steel shed — Buck Steel drawings on site. JE requested that American Steel cost out the price for a new shed also requesting cost of removal of existing bolt pattern & epox
l frame locally - Mirrored siding — 3 more sections have fallen off, will continue to reglue if possible — new sections ordered - Piano re-tuning — Patrick Baron 10/20 4. Grotto - Mattress cover — completion expected 10/30 5. Berm/Top of Hill - Hydroseed all top of hill/berm — COMPLETE - rain continues to
Entities connected to both Buck Steel and Patrick Baron

Jeffrey Epstein
PERSON
Marc Rich
PERSON
Condoleezza Rice
PERSON
Oliver Stone
PERSONLeon Black
PERSONJohn Deere
PERSONRichard Barnett
PERSONLandscaping
PERSONDarren Indyke
PERSONGerry & TJ
ORGANIZATIONMechanical Building Transformer
ORGANIZATIONCOMPLETE - JE
ORGANIZATIONBlack Heli
LOCATION
Samantha Power
PERSONCecile de Jongh
PERSONChillax Bathroom
PERSONKaren
PERSON
Carlos
PERSONLal — Peter
PERSONTime Clock
ORGANIZATION