s of 9/21) 25. Main compound - Projector Screen — new limit switches and motor required — Danny completed repairs 9/20 - COMPLETE 26. Steel shed — Buck Steel (FL) —JE approved mock-up 9/26, changes 9/27 — Buck Steel working on the final specs and quote 27. Equipment to be Purchased - (1) light generator
on placement required 10. Chillax Room — Requires furniture piece for electrical/media equipment, review pieces that are stored in PBI — Sarah 11. Chillax Bathroom - require blue rugs for bathroom & vanity area — 12. Mechanical Building Transformer —on LSJ 9/22 13. Boats - Lady G — sell — in hurricane storag
ey forwarded to the architect 9/18 - he will complete the plan by 10/5, submit to DPNR for permitting (Cecile's update as of 9/21) 24. Steel shed — Buck Steel —JE approved mock-up 9/26, changes 9/27— Buck Steel working on the final specs/quote 25. Equipment to be Purchased - (1) light generator, (2) arms
— Requires furniture piece for electrical/media equipment, reviewing pieces that are stored in PBI, which do not work, to review other options 11. Chillax Bathroom - require blue rugs for bathroom & vanity area -- 12. Mechanical Building Transformer — on site — to be removed off pallet 10/4, then review install
site, Construction crew ETA 1/11 -JE approved layout for extra metal sections & roller doors to old engineering area. Drawings/photos forwarded to Buck Steel, will finalize this - Installation of new bolts — complete 22. Eauioment/Household Purchase and Delivery - (1) 2012 JCB 8035Z Mini Excavator with
l forward by 11/18 9. Chillax Room - Media Center — on site — will not handle the weight of the equipment — need to investigate other options 10. Chillax Bathroom - Lower wall & door painted same color as trim - complete - Install Robe Hook on bathroom door — will be installed 11/17 11. Boats - Lady G — sel
site, Construction crew ETA 1/11 -JE approved layout for extra metal sections & roller doors to old engineering area. Drawings/photos forwarded to Buck Steel, will follow up this week - Installation of new bolts — 80% complete 25. Equipment/Household Purchase and Delivery - (3) Terex RL-4000 6kW Light T
Dec 9. Dock Boxes - David will fabricate a lighter lid — in production 10. Chillax Room - Media Center - ordered — shipped to Tropical 11/19 11. Chillax Bathroom - Lower wall in bathroom to be painted same color as trim - complete - Install Robe Hook on bathroom door —require location/height. Sarah has order
s of 9/21) 25. Main compound - Projector Screen — new limit switches and motor required — Danny completed repairs 9/20 - COMPLETE 26. Steel shed — Buck Steel (FL) — JE approved mock-up 9/26, changes 9/27 — Buck Steel working on the final specs and quote 27. Equipment to be Purchased - (1) light generato
on placement required 10. Chillax Room — Requires furniture piece for electrical/media equipment, review pieces that are stored in PBI — Sarah 11. Chillax Bathroom - require blue rugs for bathroom & vanity area — Sarah 12. Mechanical Building Transformer —on LSJ 9/22 13. Boats - Lady G — sell — in hurricane
outfall down the slope from the pad — architect will send updated plans once the pipe is added — to submit to DPNR for permitting 24. Steel shed — Buck Steel sent out drawings to STT via UPS on 10/12 25. Equipment to be Purchased - (1) Light generator, (2) arms with lights to be hard wired - quote receiv
uires furniture piece for electrical/media equipment, reviewing pieces that are stored in PBI, which do not work, Sarah to review other options 11. Chillax Bathroom - require blue rugs for bathroom & vanity area — Sarah 12. Mechanical Building Transformer — on site —Danny to receive bid for removal and installa
ey forwarded to the architect 9/18 - he will complete the plan by 10/5, submit to DPNR for permitting (Cecile's update as of 9/21) 24. Steel shed — Buck Steel — JE approved mock-up 9/26, changes 9/27 — Buck Steel working on the final specs/quote 25. Equipment to be Purchased - (3) light generators — Larry
floating dock — "rubberized material" 10. Chillax Room — Requires furniture piece for electrical/media equipment — suggestions forwarded 10/4 11. Chillax Bathroom - require blue rugs for bathroom & vanity area — Sarah 12. Mechanical Building Transformer — on site, off pallet, reviewing installation options 1
ey forwarded to the architect 9/18 - he will complete the plan by 10/5, submit to DPNR for permitting (Cecile's update as of 9/21) 24. Steel shed — Buck Steel — JE approved mock-up 9/26, changes 9/27 — Buck Steel working on the final specs/quote 25. Equipment to be Purchased - (1) light generator, (2) arm
— Requires furniture piece for electrical/media equipment, reviewing pieces that are stored in PBI, which do not work, to review other options 11. Chillax Bathroom - require blue rugs for bathroom & vanity area — 12. Mechanical Building Transformer — on site — to be removed off pallet 10/4, then review install
outfall down the slope from the pad — architect will send updated plans once the pipe is added — to submit to DPNR for permitting 24. Steel shed — Buck Steel sent out drawings to STT via UPS on 10/12 25. Equipment to be Purchased - (1) Light generator, (2) arms with lights to be hard wired - quote receiv
uires furniture piece for electrical/media equipment, reviewing pieces that are stored in PBI, which do not work, Sarah to review other options 11. Chillax Bathroom - require blue rugs for bathroom & vanity area — Sarah 12. Mechanical Building Transformer — on site —Danny to receive bid for removal and installa
Entities connected to both Buck Steel and Chillax Bathroom

Jeffrey Epstein
PERSON
Marc Rich
PERSON
Condoleezza Rice
PERSONDarren Indyke
PERSONLandscaping
PERSON
Oliver Stone
PERSONLeon Black
PERSONJohn Deere
PERSONRichard Barnett
PERSONGerry & TJ
ORGANIZATION
Samantha Power
PERSONBlack Heli
LOCATIONMechanical Building Transformer
ORGANIZATIONCOMPLETE - JE
ORGANIZATIONCecile de Jongh
PERSON
Carlos
PERSONNanny Cay
LOCATIONRO & Generators
ORGANIZATIONDarren & Rich
ORGANIZATIONKaren
PERSON