Wallace < > wrote: Greetings Sic The realistic date for the return of Big N is Friday, July 31. We spoke with Gene this morning (Gene spoke with Boscoe last night) who summarized for us the parts to be completed before the barge is ready for sea trials: Old engines removed and stored Engine parts
peak with Boyson on Monday, I will request their barge for the mobilization of Better Roads equipment, and that they work with us as auxiliary until Big N's return, so this project's schedule is not derailed. Respectfully, Daphne please note EFTA00700629 The information contained in this communicati
<mailto > wrote: Greetings Sir, The re=listic date for the return of Big N is Friday, July 31. We spoke with Gene this morning (Gene spoke with Boscoe last night) =ho summarized for us the parts to be completed before the barge is ready f=r sea trials: Old engines removed and stored Engine parts
peak with Boyson on Monday, I will request their barge for the mobi=ization of Better Roads equipment, and that they work with us as auxiliary=until Big N's return, so this project's schedule is not derailed.<=div> Respectfully, Daphne please =ote The information contained in this communication is con
urn - June 19, 2015 Greetings Sir, The realistic date for t=e return of Big N is Friday, July 31. We spoke wi=h Gene this morning (Gene spoke with Boscoe last night) who summarized for=us the parts to be completed before the barge is ready for sea trials: Old engines removed and stored Engine parts=
peak with =oyson on Monday, I will request their barge for the mobilization of Better=Roads equipment, and that they work with us as auxiliary until Big N's=return, so this project's schedule is not derailed. Respectfully, Daphne EFTA_R1_01623579 EFTA02498267
Entities connected to both Boscoe and Big N's