From: Daphne Wallace Sent: Friday, June 19, 2015 1:44 PM To: Jeffrey Epstein Cc: ann rodriquez; Rich Kahn Subject: Barge return - June 19, 2015 Greetings Sir, The realistic date for t=e return of Big N is Friday, July 31. We spoke wi=h Gene this morning (Gene spoke with Boscoe last night) who summarized for=us the parts to be completed before the barge is ready for sea trials: Old engines removed and stored Engine parts=swapped from old engines to new ones New engines set in pl=ce (old engines loaded for return) Alignment Exhaust s=stem Wiring to the new engines Recondition the transmi=sion Replace the fuel lines Recondition the fuel=filters Sea trials Gene does not forese= any catastrophic setbacks, but at this time he also does not see the comp=etion before the end of July. When we speak with =oyson on Monday, I will request their barge for the mobilization of Better=Roads equipment, and that they work with us as auxiliary until Big N's=return, so this project's schedule is not derailed. Respectfully, Daphne EFTA_R1_01623579 EFTA02498267