4
Shared Docs
4
Same-Page
4 / 4
Mentions
Project is to be located or integrated. 35 Client's Consultants. When requested by Architect, or required by authorities having jurisdiction over the Project, Client shall famish the services of geotedinical, civil, and environmental engineers and any other services required by the scope of the Project. 3.6 Te
f, investigating. detecting, abating. replacing, reniediating, or removing any items, products, or materials containing hazardous substances. 9.11 Design/Build by Contractor. Architect and its consultants shall have no responsibility for the design, technical adequacy or accuracy, Installation, or performance of any Des
Project is to be located or integrated. 35 Client's Consultants. When requested by Architect, or required by authorities having jurisdiction over the Project, Client shall famish the services of geotedinical, civil, and environmental engineers and any other services required by the scope of the Project. 3.6 Te
f, investigating. detecting, abating. replacing, reniediating, or removing any items, products, or materials containing hazardous substances. 9.11 Design/Build by Contractor. Architect and its consultants shall have no responsibility for the design, technical adequacy or accuracy, Installation, or performance of any Des
roject is to be located or integrated. 3.5 Client's Consultants. When requested by Architect, or required by authorities having jurisdiction over the Project, Client shall furnish the services of geotechnical, civil, and environmental engineers and any other services required by the scope of the Project. 3.6 T
of, investigating, detecting, abating, replacing, remediating, or removing any items, products, or materials containing hazardous substances. 9.11 Design/Build by Contractor. Architect and its consultants shall have no responsibility for the design, technical adequacy or accuracy, installation, or performance of any Des
roject is to be located or integrated. 3.5 Client's Consultants. When requested by Architect, or required by authorities having jurisdiction over the Project, Client shall furnish the services of geotechnical, civil, and environmental engineers and any other services required by the scope of the Project. 3.6 T
of, investigating, detecting, abating, replacing, remediating, or removing any items, products, or materials containing hazardous substances. 9.11 Design/Build by Contractor. Architect and its consultants shall have no responsibility for the design, technical adequacy or accuracy, installation, or performance of any Des
Entities connected to both the Project, Client and Design/Build by Contractor
Client, Contractor
ORGANIZATIONProject Scope
ORGANIZATIONDesign/Build
ORGANIZATIONSeparate Consultants
ORGANIZATIONReimbursable
PERSONBasic and Additional Services
ORGANIZATIONLimitations of Construction Responsibilities
ORGANIZATIONGensler
PERSONCivil Engineering
ORGANIZATIONConstruction Administration
ORGANIZATIONBulletins
PERSONFire Alarm
PERSONReview Submittals
PERSONWarwick Ian Wicksman
PERSON
Jeffrey Epstein
PERSONAndrew P. Cohen
PERSONRobert Jernigan
PERSONTom Sze
PERSONBob Anderson
PERSONArchitectural Services
ORGANIZATION