4
Shared Docs
4
Same-Page
4 / 4
Mentions
Information. Architect shall be entitled to rely upon the accuracy and completeness of the services, Information, surveys, and reports provided by Client, Contractor, or any of their subcontractors or consultants. I GerosierSTCOaozzo Artkle 4 • Construction Cost 4.1 Construction Cost. The Construction Cost sh
f, investigating. detecting, abating. replacing, reniediating, or removing any items, products, or materials containing hazardous substances. 9.11 Design/Build by Contractor. Architect and its consultants shall have no responsibility for the design, technical adequacy or accuracy, Installation, or performance of any Des
Information. Architect shall be entitled to rely upon the accuracy and completeness of the services, Information, surveys, and reports provided by Client, Contractor, or any of their subcontractors or consultants. I GerosierSTCOaozzo Artkle 4 • Construction Cost 4.1 Construction Cost. The Construction Cost sh
f, investigating. detecting, abating. replacing, reniediating, or removing any items, products, or materials containing hazardous substances. 9.11 Design/Build by Contractor. Architect and its consultants shall have no responsibility for the design, technical adequacy or accuracy, Installation, or performance of any Des
The Project Budget includes the construction budget, furniture, furnishings, equipment costs, and cost of all goods and services to be furnished by Client, Contractor, and any of their subcontractors or consultants, and contingency allowances. 1.3 Days or Time. Time periods refer to calendar days, unless otherw
of, investigating, detecting, abating, replacing, remediating, or removing any items, products, or materials containing hazardous substances. 9.11 Design/Build by Contractor. Architect and its consultants shall have no responsibility for the design, technical adequacy or accuracy, installation, or performance of any Des
The Project Budget includes the construction budget, furniture, furnishings, equipment costs, and cost of all goods and services to be furnished by Client, Contractor, and any of their subcontractors or consultants, and contingency allowances. 1.3 Days or Time. Time periods refer to calendar days, unless otherw
of, investigating, detecting, abating, replacing, remediating, or removing any items, products, or materials containing hazardous substances. 9.11 Design/Build by Contractor. Architect and its consultants shall have no responsibility for the design, technical adequacy or accuracy, installation, or performance of any Des
Entities connected to both Client, Contractor and Design/Build by Contractor
Limitations of Construction Responsibilities
ORGANIZATIONProject Scope
ORGANIZATIONDesign/Build
ORGANIZATIONSeparate Consultants
ORGANIZATIONReimbursable
PERSONBasic and Additional Services
ORGANIZATIONthe Project, Client
ORGANIZATIONGensler
PERSONCivil Engineering
ORGANIZATIONConstruction Administration
ORGANIZATIONBulletins
PERSONFire Alarm
PERSONReview Submittals
PERSONWarwick Ian Wicksman
PERSON
Jeffrey Epstein
PERSONAndrew P. Cohen
PERSONRobert Jernigan
PERSONTom Sze
PERSONBob Anderson
PERSONArchitectural Services
ORGANIZATION