3
Shared Docs
3
Same-Page
3 / 3
Mentions
l be based on Gensler's Standard Hourly Billing Rates. Additional Services shall include, but not be limited to, the following: Making revisions in Drawings, Specifications, Project Manual or other documents, when such revisions are, through no fault of the Architect: (a) inconsistent with approvals or instructions pre
Gensler Standard Hourly Billina Rates Warwick Wicksman Project Principal/Project Manager $230.00 Tom Sze Project Designer $180.00 Bob Anderson Project Architect $150.00 Senior Professional Staff $140.00 - $200.00 Intermediate Professional Staff $85.00 - $135.00 Junior Professional Staff $60.00 - $80.00
l be based on Gensler's Standard Hourly Billing Rates. Additional Services shall include, but not be limited to, the following: Making revisions in Drawings, Specifications, Project Manual or other documents, when such revisions are, through no fault of the Architect: (a) inconsistent with approvals or instructions pre
Gensler Standard Hourly Billina Rates Warwick Wicksman Project Principal/Project Manager $230.00 Tom Sze Project Designer $180.00 Bob Anderson Project Architect $150.00 Senior Professional Staff $140.00 - $200.00 Intermediate Professional Staff $85.00 - $135.00 Junior Professional Staff $60.00 - $80.00
l be based on Gensler's Standard Hourly Billing Rates. Additional Services shall include, but not be limited to, the following: Making revisions in Drawings, Specifications, Project Manual or other documents when such revisions are: (a) inconsistent with approvals or instructions previously given by Client, including r
Gensler Standard Hourly Billing Rates Warwick Wicksman Project Principal/Project Manager $230.00 Tom Sze Project Designer $180.00 Bob Anderson Project Architect $150.00 Senior Professional Staff $140.00 - $200.00 Intermediate Professional Staff $85.00 - $135.00 Junior Professional Staff $60.00 - $80.00
Entities connected to both Drawings, Specifications and Project Architect
Reimbursable
PERSON
Jeffrey Epstein
PERSONSchematic Design Phase
ORGANIZATIONSubstantial Completion
ORGANIZATIONEpstein Interests
ORGANIZATIONHBRK Associates
ORGANIZATIONGensler
PERSONProduct Data
ORGANIZATIONBasic and Additional Services
ORGANIZATIONStructural Engineering
ORGANIZATIONCivil Engineering
ORGANIZATIONConstruction Administration
ORGANIZATIONBulletins
PERSONFire Alarm
PERSONReview Submittals
PERSONWarwick Ian Wicksman
PERSONAndrew P. Cohen
PERSONRobert Jernigan
PERSONTom Sze
PERSON
Prince Andrew
PERSON