3
Shared Docs
3
Same-Page
3 / 3
Mentions
a lump sum D.1.1 Initial Payment. An initial payment shall be paid upon commencement of each phase of Gensler's and our Consultants' services. a) Schematic Design Phase: $50,000 plus 50% Consultants' SD Fee b) Design Development Phase: $50,000 plus 50% Consultants' DD Fee c) Construction Documents Phase: $100,00
f, investigating. detecting, abating. replacing, reniediating, or removing any items, products, or materials containing hazardous substances. 9.11 Design/Build by Contractor. Architect and its consultants shall have no responsibility for the design, technical adequacy or accuracy, Installation, or performance of any Des
a lump sum D.1.1 Initial Payment. An initial payment shall be paid upon commencement of each phase of Gensler's and our Consultants' services. a) Schematic Design Phase: $50,000 plus 50% Consultants' SD Fee b) Design Development Phase: $50,000 plus 50% Consultants' DD Fee c) Construction Documents Phase: $100,00
f, investigating. detecting, abating. replacing, reniediating, or removing any items, products, or materials containing hazardous substances. 9.11 Design/Build by Contractor. Architect and its consultants shall have no responsibility for the design, technical adequacy or accuracy, Installation, or performance of any Des
a lump sum D.1.1 Initial Payment. An initial payment shall be paid upon commencement of each phase of Gensler's and our Consultants' services. a) Schematic Design Phase: b) Design Development Phase: c) Construction Documents Phase: Fee d) Construction Administration Phase: $50,000 plus 50% Consultants' SD Fee $
of, investigating, detecting, abating, replacing, remediating, or removing any items, products, or materials containing hazardous substances. 9.11 Design/Build by Contractor. Architect and its consultants shall have no responsibility for the design, technical adequacy or accuracy, installation, or performance of any Des
Entities connected to both Schematic Design Phase and Design/Build by Contractor
Reimbursable
PERSONSubstantial Completion
ORGANIZATION
Jeffrey Epstein
PERSONProject Architect
ORGANIZATIONLimitations of Construction Responsibilities
ORGANIZATIONGensler
PERSONDesign/Build
ORGANIZATIONProject Scope
ORGANIZATIONClient, Contractor
ORGANIZATIONSeparate Consultants
ORGANIZATIONthe Project, Client
ORGANIZATIONBasic and Additional Services
ORGANIZATIONReview Submittals
PERSONWarwick Ian Wicksman
PERSONAndrew P. Cohen
PERSONRobert Jernigan
PERSONTom Sze
PERSONBob Anderson
PERSONArchitectural Services
ORGANIZATIONProject Description
ORGANIZATION