esidence: $ 23,500 4. Dock House: S 22.000 $1,003,250 Refer to the Attachment B, Scope and Fee Summary, for additional information. a lump sum D.1.1 Initial Payment. An initial payment shall be paid upon commencement of each phase of Gensler's and our Consultants' services. a) Schematic Design Phase: $50,000 p
dates outlined in the Project Schedule in the agreement, Architect's compensation shall be equitably adjusted. I Giesler STC 080220 85 Change In Project Scope. If portions of the Project are deleted or otherwise not constructed, compensation for those portions of the Project shall be payable to the extent
esidence: $ 23,500 4. Dock House: S 22.000 $1,003,250 Refer to the Attachment B, Scope and Fee Summary, for additional information. a lump sum D.1.1 Initial Payment. An initial payment shall be paid upon commencement of each phase of Gensler's and our Consultants' services. a) Schematic Design Phase: $50,000 p
dates outlined in the Project Schedule in the agreement, Architect's compensation shall be equitably adjusted. I Giesler STC 080220 85 Change In Project Scope. If portions of the Project are deleted or otherwise not constructed, compensation for those portions of the Project shall be payable to the extent
esidence: $ 23,500 4. Pock House: $ 22,000 $1,003,250 Refer to the Attachment B, Scope and Fee Summary, for additional information. a lump sum D.1.1 Initial Payment. An initial payment shall be paid upon commencement of each phase of Gensler's and our Consultants' services. a) Schematic Design Phase: b) Design
180) days beyond the dates outlined in the Project Schedule in the agreement, Architect's compensation shall be equitably adjusted. 8.5 Change In Project Scope. If portions of the Project are deleted or otherwise not constructed, compensation for those portions of the Project shall be payable to the extent
Entities connected to both D.1.1 Initial Payment and Project Scope
Design/Build by Contractor
ORGANIZATIONBasic and Additional Services
ORGANIZATIONDesign/Build
ORGANIZATIONSeparate Consultants
ORGANIZATIONReimbursable
PERSONLimitations of Construction Responsibilities
ORGANIZATIONGensler
PERSONthe Project, Client
ORGANIZATIONClient, Contractor
ORGANIZATIONCivil Engineering
ORGANIZATIONConstruction Administration
ORGANIZATIONBulletins
PERSONFire Alarm
PERSONReview Submittals
PERSONWarwick Ian Wicksman
PERSONAndrew P. Cohen
PERSONRobert Jernigan
PERSON
Jeffrey Epstein
PERSONBob Anderson
PERSONArchitectural Services
ORGANIZATION