3
Shared Docs
3
Same-Page
3 / 3
Mentions
esidence: $ 23,500 4. Dock House: S 22.000 $1,003,250 Refer to the Attachment B, Scope and Fee Summary, for additional information. a lump sum D.1.1 Initial Payment. An initial payment shall be paid upon commencement of each phase of Gensler's and our Consultants' services. a) Schematic Design Phase: $50,000 p
Information. Architect shall be entitled to rely upon the accuracy and completeness of the services, Information, surveys, and reports provided by Client, Contractor, or any of their subcontractors or consultants. I GerosierSTCOaozzo Artkle 4 • Construction Cost 4.1 Construction Cost. The Construction Cost sh
esidence: $ 23,500 4. Dock House: S 22.000 $1,003,250 Refer to the Attachment B, Scope and Fee Summary, for additional information. a lump sum D.1.1 Initial Payment. An initial payment shall be paid upon commencement of each phase of Gensler's and our Consultants' services. a) Schematic Design Phase: $50,000 p
Information. Architect shall be entitled to rely upon the accuracy and completeness of the services, Information, surveys, and reports provided by Client, Contractor, or any of their subcontractors or consultants. I GerosierSTCOaozzo Artkle 4 • Construction Cost 4.1 Construction Cost. The Construction Cost sh
esidence: $ 23,500 4. Pock House: $ 22,000 $1,003,250 Refer to the Attachment B, Scope and Fee Summary, for additional information. a lump sum D.1.1 Initial Payment. An initial payment shall be paid upon commencement of each phase of Gensler's and our Consultants' services. a) Schematic Design Phase: b) Design
The Project Budget includes the construction budget, furniture, furnishings, equipment costs, and cost of all goods and services to be furnished by Client, Contractor, and any of their subcontractors or consultants, and contingency allowances. 1.3 Days or Time. Time periods refer to calendar days, unless otherw
Entities connected to both D.1.1 Initial Payment and Client, Contractor
Design/Build by Contractor
ORGANIZATIONBasic and Additional Services
ORGANIZATIONDesign/Build
ORGANIZATIONSeparate Consultants
ORGANIZATIONReimbursable
PERSONthe Project, Client
ORGANIZATIONGensler
PERSONProject Scope
ORGANIZATIONLimitations of Construction Responsibilities
ORGANIZATIONCivil Engineering
ORGANIZATIONConstruction Administration
ORGANIZATIONBulletins
PERSONFire Alarm
PERSONReview Submittals
PERSONWarwick Ian Wicksman
PERSONAndrew P. Cohen
PERSONRobert Jernigan
PERSON
Jeffrey Epstein
PERSONBob Anderson
PERSONArchitectural Services
ORGANIZATION