esidence: $ 23,500 4. Dock House: S 22.000 $1,003,250 Refer to the Attachment B, Scope and Fee Summary, for additional information. a lump sum D.1.1 Initial Payment. An initial payment shall be paid upon commencement of each phase of Gensler's and our Consultants' services. a) Schematic Design Phase: $50,000 p
services may vary with required sequences of coordination. • Plus standard reimbursable expenses. • * Allowance, to be billed hourly *** Pool CD/CA Services pending further review by the Owner. 2. ATV Garage New construction. Assumes all design services are performed in conjunction with the Pool Area w
esidence: $ 23,500 4. Dock House: S 22.000 $1,003,250 Refer to the Attachment B, Scope and Fee Summary, for additional information. a lump sum D.1.1 Initial Payment. An initial payment shall be paid upon commencement of each phase of Gensler's and our Consultants' services. a) Schematic Design Phase: $50,000 p
t services may vary with required sequences of coordination. • Plus standard reimbursable expenses. ** Allowance, to be billed hourly ••• Pool CD/CA Services pending further review by the Owner. 2. ATV Garage New construction. Assumes all design services me performed in conjunction with the Pool Area wo
esidence: $ 23,500 4. Pock House: $ 22,000 $1,003,250 Refer to the Attachment B, Scope and Fee Summary, for additional information. a lump sum D.1.1 Initial Payment. An initial payment shall be paid upon commencement of each phase of Gensler's and our Consultants' services. a) Schematic Design Phase: b) Design
nt services may vary with required sequences of coordination. * Plus standard reimbursable expenses. " Allowance, to be billed hourly *** Pool CD/CA Services pending further review by the Owner. 2. ATV Garage: New construction. Assumes all design services are performed in conjunction with the Pool Area
Entities connected to both D.1.1 Initial Payment and CA Services
Tom Sze
PERSON
Prince Andrew
PERSON
Michael Cohen
PERSONDock House
ORGANIZATIONSchematic Design Phase
ORGANIZATIONDrawings, Specifications
ORGANIZATIONProject Manual
ORGANIZATIONProject Budget or Project
ORGANIZATIONStandard Terms and Conditions
ORGANIZATIONGensler Standard Billing Rate Schedule
ORGANIZATIONWarwick Wicksman Project Principal/Project
ORGANIZATIONProject Designer
ORGANIZATIONProject Architect
ORGANIZATIONGrand Stair
ORGANIZATIONATV Garage
ORGANIZATIONClient, Contractor
ORGANIZATIONLimitations of Construction Responsibilities
ORGANIZATIONthe Project, Client
ORGANIZATIONProject Scope
ORGANIZATIONDesign/Build by Contractor
ORGANIZATION