esidence: $ 23,500 4. Dock House: S 22.000 $1,003,250 Refer to the Attachment B, Scope and Fee Summary, for additional information. a lump sum D.1.1 Initial Payment. An initial payment shall be paid upon commencement of each phase of Gensler's and our Consultants' services. a) Schematic Design Phase: $50,000 p
l be based on Gensler's Standard Hourly Billing Rates. Additional Services shall include, but not be limited to, the following: Making revisions in Drawings, Specifications, Project Manual or other documents, when such revisions are, through no fault of the Architect: (a) inconsistent with approvals or instructions pre
esidence: $ 23,500 4. Dock House: S 22.000 $1,003,250 Refer to the Attachment B, Scope and Fee Summary, for additional information. a lump sum D.1.1 Initial Payment. An initial payment shall be paid upon commencement of each phase of Gensler's and our Consultants' services. a) Schematic Design Phase: $50,000 p
l be based on Gensler's Standard Hourly Billing Rates. Additional Services shall include, but not be limited to, the following: Making revisions in Drawings, Specifications, Project Manual or other documents, when such revisions are, through no fault of the Architect: (a) inconsistent with approvals or instructions pre
esidence: $ 23,500 4. Pock House: $ 22,000 $1,003,250 Refer to the Attachment B, Scope and Fee Summary, for additional information. a lump sum D.1.1 Initial Payment. An initial payment shall be paid upon commencement of each phase of Gensler's and our Consultants' services. a) Schematic Design Phase: b) Design
l be based on Gensler's Standard Hourly Billing Rates. Additional Services shall include, but not be limited to, the following: Making revisions in Drawings, Specifications, Project Manual or other documents when such revisions are: (a) inconsistent with approvals or instructions previously given by Client, including r
Entities connected to both D.1.1 Initial Payment and Drawings, Specifications
Tom Sze
PERSON
Prince Andrew
PERSON
Michael Cohen
PERSONDock House
ORGANIZATIONSchematic Design Phase
ORGANIZATIONProject Manual
ORGANIZATIONProject Budget or Project
ORGANIZATIONStandard Terms and Conditions
ORGANIZATIONGensler Standard Billing Rate Schedule
ORGANIZATIONWarwick Wicksman Project Principal/Project
ORGANIZATIONProject Designer
ORGANIZATIONProject Architect
ORGANIZATIONGrand Stair
ORGANIZATIONCA Services
ORGANIZATIONATV Garage
ORGANIZATIONClient, Contractor
ORGANIZATIONLimitations of Construction Responsibilities
ORGANIZATIONthe Project, Client
ORGANIZATIONProject Scope
ORGANIZATIONDesign/Build by Contractor