3
Shared Docs
3
Same-Page
3 / 3
Mentions
hanges. Gensler may authorize minor changes in the Work if they are consistent with the aesthetic design Intent and do not involve an adjustment in the Project Budget or Schedule. 3.4. Contractor's Payment Applications. Gensler will review Contractor's monthly payment applications and make recommendations to Client regarding
g perimeter. c) Soils or Geotechnical Engineering. d) Fire Alarm and Detection Systems Engineering (fire sprinkler system, fire alarm system). e) Design Services related to utilities to be supplied to the building, including water supply and storage, electrical supply and transformers, propane, and septic sy
hanges. Gensler may authorize minor changes in the Work if they are consistent with the aesthetic design Intent and do not involve an adjustment in the Project Budget or Schedule. 3.4. Contractor's Payment Applications. Gensler will review Contractor's monthly payment applications and make recommendations to Client regarding
g perimeter. c) Soils or Geotechnical Engineering. d) Fire Alarm and Detection Systems Engineering (fire sprinkler system, fire alarm system). e) Design Services related to utilities to be supplied to the building, including water supply and storage, electrical supply and transformers, propane, and septic sy
hanges. Gensler may authorize minor changes in the Work if they are consistent with the aesthetic design intent and do not involve an adjustment in the Project Budget or Schedule. 3.4. Contractor's Payment Applications. Gensler will review Contractor's monthly payment applications and make recommendations to Client regarding
g perimeter. c) Soils or Geotechnical Engineering. d) Fire Alarm and Detection Systems Engineering (fire sprinkler system, fire alarm system). e) Design Services related to utilities to be supplied to the building, including water supply and storage, electrical supply and transformers, propane, and septic sy
Entities connected to both the Project Budget or Schedule and Design Services

Jeffrey Epstein
PERSONGensler
PERSON
Michael Cohen
PERSON
Joe Biden
PERSONEpstein Interests
ORGANIZATIONHBRK Associates
ORGANIZATIONTom Sze
PERSON
Prince Andrew
PERSONSchematic Design Phase
ORGANIZATIONDrawings, Specifications
ORGANIZATIONProject Manual
ORGANIZATIONProject Budget or Project
ORGANIZATIONStandard Terms and Conditions
ORGANIZATIONGensler Standard Billing Rate Schedule
ORGANIZATIONWarwick Wicksman Project Principal/Project
ORGANIZATIONProject Designer
ORGANIZATIONProject Architect
ORGANIZATIONGrand Stair
ORGANIZATIONCA Services
ORGANIZATIONATV Garage
ORGANIZATION