3
Shared Docs
3
Same-Page
3 / 3
Mentions
ctor's proposed methods of fabrication are generally consistent with the aesthetic design intent. Gensler will conduct up to two (2) reviews of any Submittal as a Basic Service. 3.3. Changes. Gensler may authorize minor changes in the Work if they are consistent with the aesthetic design Intent and do no
dates outlined in the Project Schedule in the agreement, Architect's compensation shall be equitably adjusted. I Giesler STC 080220 85 Change In Project Scope. If portions of the Project are deleted or otherwise not constructed, compensation for those portions of the Project shall be payable to the extent
ctor's proposed methods of fabrication are generally consistent with the aesthetic design intent. Gensler will conduct up to two (2) reviews of any Submittal as a Basic Service. 3.3. Changes. Gensler may authorize minor changes in the Work if they are consistent with the aesthetic design Intent and do no
dates outlined in the Project Schedule in the agreement, Architect's compensation shall be equitably adjusted. I Giesler STC 080220 85 Change In Project Scope. If portions of the Project are deleted or otherwise not constructed, compensation for those portions of the Project shall be payable to the extent
ctor's proposed methods of fabrication are generally consistent with the aesthetic design intent. Gensler will conduct up to two (2) reviews of any Submittal as a Basic Service. 3.3. Changes. Gensler may authorize minor changes in the Work if they are consistent with the aesthetic design intent and do no
180) days beyond the dates outlined in the Project Schedule in the agreement, Architect's compensation shall be equitably adjusted. 8.5 Change In Project Scope. If portions of the Project are deleted or otherwise not constructed, compensation for those portions of the Project shall be payable to the extent
Entities connected to both Submittal and Project Scope
Separate Consultants
ORGANIZATIONArchitectural Services
ORGANIZATIONthe Project, Client
ORGANIZATION
Jeffrey Epstein
PERSONReimbursable
PERSONGensler
PERSONBasic and Additional Services
ORGANIZATIONLimitations of Construction Responsibilities
ORGANIZATIONDesign/Build by Contractor
ORGANIZATIONDesign/Build
ORGANIZATIONClient, Contractor
ORGANIZATIONBulletins
PERSONFire Alarm
PERSONReview Submittals
PERSONWarwick Ian Wicksman
PERSONAndrew P. Cohen
PERSONRobert Jernigan
PERSONTom Sze
PERSONBob Anderson
PERSONProject Description
ORGANIZATION