3
Shared Docs
3
Same-Page
3 / 3
Mentions
ctor's proposed methods of fabrication are generally consistent with the aesthetic design intent. Gensler will conduct up to two (2) reviews of any Submittal as a Basic Service. 3.3. Changes. Gensler may authorize minor changes in the Work if they are consistent with the aesthetic design Intent and do no
r 18, 2009 Page 11 Attachment B: Scope and Fee Summary I. Pool Area: New Construction Includes East and West Cabanas, North and South Pavilions, Grand Stair, Pool, Pool Deck, and Basement . Architectural services include shell/core services for all areas, and Interior Design services at the Screening Ro
ctor's proposed methods of fabrication are generally consistent with the aesthetic design intent. Gensler will conduct up to two (2) reviews of any Submittal as a Basic Service. 3.3. Changes. Gensler may authorize minor changes in the Work if they are consistent with the aesthetic design Intent and do no
services Room only! This column Gensler only was paid retainer for this work. progress payment due for up to 60% this scope and South Pavilions, Grand Stair, de slwWcore services for all areas, SD DD CD CA Total Gensler $100,000 $96,000 $222,000 $95,000 $513,000 Structural $9,375 $11,500 $
ctor's proposed methods of fabrication are generally consistent with the aesthetic design intent. Gensler will conduct up to two (2) reviews of any Submittal as a Basic Service. 3.3. Changes. Gensler may authorize minor changes in the Work if they are consistent with the aesthetic design intent and do no
18, 2009 Page 11 Attachment B: Scope and Fee Summary I Pool Area: New Construction. Includes East and West Cabanas, North and South Pavilions, Grand Stair, Pool, Pool Deck, and Basement . Architectural services include shelUcore services for all areas, and Interior Design services at the Screening Roo
Entities connected to both Submittal and Grand Stair
Gensler
PERSON
Jeffrey Epstein
PERSONArchitectural Services
ORGANIZATION
Joe Biden
PERSONEpstein Interests
ORGANIZATIONHBRK Associates
ORGANIZATIONProduct Data
ORGANIZATIONSubstantial Completion
ORGANIZATIONBasic and Additional Services
ORGANIZATIONStructural Engineering
ORGANIZATIONCivil Engineering
ORGANIZATIONReimbursable
PERSONConstruction Administration
ORGANIZATIONBulletins
PERSONFire Alarm
PERSONReview Submittals
PERSONWarwick Ian Wicksman
PERSONAndrew P. Cohen
PERSONRobert Jernigan
PERSONTom Sze
PERSON