3
Shared Docs
3
Same-Page
3 / 3
Mentions
ctor's proposed methods of fabrication are generally consistent with the aesthetic design intent. Gensler will conduct up to two (2) reviews of any Submittal as a Basic Service. 3.3. Changes. Gensler may authorize minor changes in the Work if they are consistent with the aesthetic design Intent and do no
g perimeter. c) Soils or Geotechnical Engineering. d) Fire Alarm and Detection Systems Engineering (fire sprinkler system, fire alarm system). e) Design Services related to utilities to be supplied to the building, including water supply and storage, electrical supply and transformers, propane, and septic sy
ctor's proposed methods of fabrication are generally consistent with the aesthetic design intent. Gensler will conduct up to two (2) reviews of any Submittal as a Basic Service. 3.3. Changes. Gensler may authorize minor changes in the Work if they are consistent with the aesthetic design Intent and do no
g perimeter. c) Soils or Geotechnical Engineering. d) Fire Alarm and Detection Systems Engineering (fire sprinkler system, fire alarm system). e) Design Services related to utilities to be supplied to the building, including water supply and storage, electrical supply and transformers, propane, and septic sy
ctor's proposed methods of fabrication are generally consistent with the aesthetic design intent. Gensler will conduct up to two (2) reviews of any Submittal as a Basic Service. 3.3. Changes. Gensler may authorize minor changes in the Work if they are consistent with the aesthetic design intent and do no
g perimeter. c) Soils or Geotechnical Engineering. d) Fire Alarm and Detection Systems Engineering (fire sprinkler system, fire alarm system). e) Design Services related to utilities to be supplied to the building, including water supply and storage, electrical supply and transformers, propane, and septic sy
Entities connected to both Submittal and Design Services

Jeffrey Epstein
PERSONGensler
PERSONArchitectural Services
ORGANIZATION
Joe Biden
PERSONEpstein Interests
ORGANIZATIONHBRK Associates
ORGANIZATIONRobert Jernigan
PERSON
Prince Andrew
PERSON
Michael Cohen
PERSOND.1.1 Initial Payment
ORGANIZATIONSchematic Design Phase
ORGANIZATIONDrawings, Specifications
ORGANIZATIONProject Manual
ORGANIZATIONProject Budget or Project
ORGANIZATIONStandard Terms and Conditions
ORGANIZATIONGensler Standard Billing Rate Schedule
ORGANIZATIONWarwick Wicksman Project Principal/Project
ORGANIZATIONProject Designer
ORGANIZATIONProject Architect
ORGANIZATIONGrand Stair
ORGANIZATION