3
Shared Docs
3
Same-Page
3 / 3
Mentions
ler will recommend that Client reject it. Gensler will also recommend inspection or testing of the Work if Gensler believes it is appropriate. 3.2 Communications During Construction. Client and Contractor shall communicate with each other, and with Gensler's consultants, through Gensler. Gensler will maintain logs of documents
g perimeter. c) Soils or Geotechnical Engineering. d) Fire Alarm and Detection Systems Engineering (fire sprinkler system, fire alarm system). e) Design Services related to utilities to be supplied to the building, including water supply and storage, electrical supply and transformers, propane, and septic sy
ler will recommend that Client reject it. Gensler will also recommend inspection or testing of the Work if Gensler believes it is appropriate. 3.2 Communications During Construction. Client and Contractor shall communicate with each other, and with Gensler's consultants, through Gensler. Gensler will maintain logs of documents
g perimeter. c) Soils or Geotechnical Engineering. d) Fire Alarm and Detection Systems Engineering (fire sprinkler system, fire alarm system). e) Design Services related to utilities to be supplied to the building, including water supply and storage, electrical supply and transformers, propane, and septic sy
ler will recommend that Client reject it. Gensler will also recommend inspection or testing of the Work if Gensler believes it is appropriate. 3.2 Communications During Construction. Client and Contractor shall communicate with each other, and with Gensler's consultants, through Gensler. Gensler will maintain logs of documents
g perimeter. c) Soils or Geotechnical Engineering. d) Fire Alarm and Detection Systems Engineering (fire sprinkler system, fire alarm system). e) Design Services related to utilities to be supplied to the building, including water supply and storage, electrical supply and transformers, propane, and septic sy
Entities connected to both Communications During Construction and Design Services

Jeffrey Epstein
PERSONGensler
PERSON
Michael Cohen
PERSON
Joe Biden
PERSONEpstein Interests
ORGANIZATIONHBRK Associates
ORGANIZATIONTom Sze
PERSON
Prince Andrew
PERSONSchematic Design Phase
ORGANIZATIONDrawings, Specifications
ORGANIZATIONProject Manual
ORGANIZATIONProject Budget or Project
ORGANIZATIONStandard Terms and Conditions
ORGANIZATIONGensler Standard Billing Rate Schedule
ORGANIZATIONWarwick Wicksman Project Principal/Project
ORGANIZATIONProject Designer
ORGANIZATIONProject Architect
ORGANIZATIONGrand Stair
ORGANIZATIONCA Services
ORGANIZATIONATV Garage
ORGANIZATION