3
Shared Docs
3
Same-Page
3 / 3
Mentions
itectural Services September 18, 2009 Page 4 will secure an Architectural License in USVI, through reciprocal agreements between the US and USVI. Gensler Consultants will secure similar licenses, if required by local agencies. 3. Construction Administration. Gensler will assist Client with Construction Administ
a lump sum D.1.1 Initial Payment. An initial payment shall be paid upon commencement of each phase of Gensler's and our Consultants' services. a) Schematic Design Phase: $50,000 plus 50% Consultants' SD Fee b) Design Development Phase: $50,000 plus 50% Consultants' DD Fee c) Construction Documents Phase: $100,00
itectural Services September 18, 2009 Page 4 will secure an Architectural License in USVI, through reciprocal agreements between the US and USVI. Gensler Consultants will secure similar licenses, if required by local agencies. 3. Construction Administration. Gensler will assist Client with Construction Administ
a lump sum D.1.1 Initial Payment. An initial payment shall be paid upon commencement of each phase of Gensler's and our Consultants' services. a) Schematic Design Phase: $50,000 plus 50% Consultants' SD Fee b) Design Development Phase: $50,000 plus 50% Consultants' DD Fee c) Construction Documents Phase: $100,00
itectural Services September 18, 2009 Page 4 will secure an Architectural License in USVI, through reciprocal agreements between the US and USVI. Gensler Consultants will secure similar licenses, if required by local agencies. 3. Construction Administration. Gensler will assist Client with Construction Administ
a lump sum D.1.1 Initial Payment. An initial payment shall be paid upon commencement of each phase of Gensler's and our Consultants' services. a) Schematic Design Phase: b) Design Development Phase: c) Construction Documents Phase: Fee d) Construction Administration Phase: $50,000 plus 50% Consultants' SD Fee $
Entities connected to both Gensler Consultants and Schematic Design Phase
Reimbursable
PERSON
Jeffrey Epstein
PERSONSubstantial Completion
ORGANIZATIONProject Architect
ORGANIZATIONEpstein Interests
ORGANIZATIONHBRK Associates
ORGANIZATIONGensler
PERSONProduct Data
ORGANIZATIONBasic and Additional Services
ORGANIZATIONStructural Engineering
ORGANIZATIONCivil Engineering
ORGANIZATIONConstruction Administration
ORGANIZATIONBulletins
PERSONFire Alarm
PERSONReview Submittals
PERSONWarwick Ian Wicksman
PERSONAndrew P. Cohen
PERSONRobert Jernigan
PERSONTom Sze
PERSON
Prince Andrew
PERSON