3
Shared Docs
3
Same-Page
3 / 3
Mentions
id upon commencement of each phase of Gensler's and our Consultants' services. a) Schematic Design Phase: $50,000 plus 50% Consultants' SD Fee b) Design Development Phase: $50,000 plus 50% Consultants' DD Fee c) Construction Documents Phase: $100,000 plus 25% Consultants' CD Fee d) Construction Administration Phas
andard Hourly Billing Rates. Additional Services shall include, but not be limited to, the following: Making revisions in Drawings, Specifications, Project Manual or other documents, when such revisions are, through no fault of the Architect: (a) inconsistent with approvals or instructions previously given by
id upon commencement of each phase of Gensler's and our Consultants' services. a) Schematic Design Phase: $50,000 plus 50% Consultants' SD Fee b) Design Development Phase: $50,000 plus 50% Consultants' DD Fee c) Construction Documents Phase: $100,000 plus 25% Consultants' CD Fee d) Construction Administration Phas
andard Hourly Billing Rates. Additional Services shall include, but not be limited to, the following: Making revisions in Drawings, Specifications, Project Manual or other documents, when such revisions are, through no fault of the Architect: (a) inconsistent with approvals or instructions previously given by
ayment. An initial payment shall be paid upon commencement of each phase of Gensler's and our Consultants' services. a) Schematic Design Phase: b) Design Development Phase: c) Construction Documents Phase: Fee d) Construction Administration Phase: $50,000 plus 50% Consultants' SD Fee $50,000 plus 50% Consultants' D
andard Hourly Billing Rates. Additional Services shall include, but not be limited to, the following: Making revisions in Drawings, Specifications, Project Manual or other documents when such revisions are: (a) inconsistent with approvals or instructions previously given by Client, including revisions made ne
Entities connected to both Design Development Phase and Project Manual
Reimbursable
PERSON
Jeffrey Epstein
PERSON
Michael Cohen
PERSON
Joe Biden
PERSONEpstein Interests
ORGANIZATIONHBRK Associates
ORGANIZATIONGensler
PERSONProduct Data
ORGANIZATIONSubstantial Completion
ORGANIZATIONBasic and Additional Services
ORGANIZATIONStructural Engineering
ORGANIZATIONCivil Engineering
ORGANIZATIONTom Sze
PERSON
Prince Andrew
PERSOND.1.1 Initial Payment
ORGANIZATIONSchematic Design Phase
ORGANIZATIONDrawings, Specifications
ORGANIZATIONProject Budget or Project
ORGANIZATIONStandard Terms and Conditions
ORGANIZATIONGensler Standard Billing Rate Schedule
ORGANIZATION