3
Shared Docs
3
Same-Page
3 / 3
Mentions
red by Gensler's consultants; 1) Preliminary project description; g) Perspective views of 3D "Sketch-up" model. Gensler will provide two copies of the Schematic Design Documents and will meet with Client one time (location TBD) to present and review the material. EFTA00605621 Gensler Little St. James Pool Area and Screen
following documents, in order of precedence: a) amendments and modifications signed by both parties; b) This Letter of Agreement; c) The attached Standard Terms and Conditions (STC); d) The attached Gensler Standard Billing Rate Schedule (Attachment A); e) The detailed fee summary (Attachment B); f) The attached Scope Di
red by Gensler's consultants; 1) Preliminary project description; g) Perspective views of 3D "Sketch-up" model. Gensler will provide two copies of the Schematic Design Documents and will meet with Client one time (location TBD) to present and review the material. EFTA00724807 Gensler Little St. James Pool Area and Screen
following documents, in order of precedence: a) amendments and modifications signed by both parties; b) This Letter of Agreement; c) The attached Standard Terms and Conditions (STC); d) The attached Gensler Standard Billing Rate Schedule (Attachment A); e) The detailed fee summary (Attachment B); f) The attached Scope Di
red by Gensler's consultants; f) Preliminary project description; g) Perspective views of 3D "Sketch-up" model. Gensler will provide two copies of the Schematic Design Documents and will meet with Client one time (location TBD) to present and review the material. EFTA00727146 Gensler Little St. James Pool Area and Screen
following documents, in order of precedence: a) amendments and modifications signed by both parties; b) This Letter of Agreement; c) The attached Standard Terms and Conditions (STC); d) The attached Gensler Standard Billing Rate Schedule (Attachment A); e) The detailed fee summary (Attachment B); f) The attached Scope Di
Entities connected to both the Schematic Design Documents and Standard Terms and Conditions

Jeffrey Epstein
PERSONConstruction Administration
ORGANIZATIONthe Schematic Design
ORGANIZATIONSubstantial Completion
ORGANIZATIONEpstein Interests
ORGANIZATIONHBRK Associates
ORGANIZATIONGensler
PERSONProduct Data
ORGANIZATIONBasic and Additional Services
ORGANIZATIONStructural Engineering
ORGANIZATIONCivil Engineering
ORGANIZATIONReimbursable
PERSONBulletins
PERSONFire Alarm
PERSONReview Submittals
PERSONWarwick Ian Wicksman
PERSONAndrew P. Cohen
PERSONRobert Jernigan
PERSONTom Sze
PERSON
Prince Andrew
PERSON