red by Gensler's consultants; 1) Preliminary project description; g) Perspective views of 3D "Sketch-up" model. Gensler will provide two copies of the Schematic Design Documents and will meet with Client one time (location TBD) to present and review the material. EFTA00605621 Gensler Little St. James Pool Area and Screen
id upon commencement of each phase of Gensler's and our Consultants' services. a) Schematic Design Phase: $50,000 plus 50% Consultants' SD Fee b) Design Development Phase: $50,000 plus 50% Consultants' DD Fee c) Construction Documents Phase: $100,000 plus 25% Consultants' CD Fee d) Construction Administration Phas
red by Gensler's consultants; 1) Preliminary project description; g) Perspective views of 3D "Sketch-up" model. Gensler will provide two copies of the Schematic Design Documents and will meet with Client one time (location TBD) to present and review the material. EFTA00724807 Gensler Little St. James Pool Area and Screen
id upon commencement of each phase of Gensler's and our Consultants' services. a) Schematic Design Phase: $50,000 plus 50% Consultants' SD Fee b) Design Development Phase: $50,000 plus 50% Consultants' DD Fee c) Construction Documents Phase: $100,000 plus 25% Consultants' CD Fee d) Construction Administration Phas
red by Gensler's consultants; f) Preliminary project description; g) Perspective views of 3D "Sketch-up" model. Gensler will provide two copies of the Schematic Design Documents and will meet with Client one time (location TBD) to present and review the material. EFTA00727146 Gensler Little St. James Pool Area and Screen
ayment. An initial payment shall be paid upon commencement of each phase of Gensler's and our Consultants' services. a) Schematic Design Phase: b) Design Development Phase: c) Construction Documents Phase: Fee d) Construction Administration Phase: $50,000 plus 50% Consultants' SD Fee $50,000 plus 50% Consultants' D
Entities connected to both the Schematic Design Documents and Design Development Phase
Reimbursable
PERSON
Jeffrey Epstein
PERSON
Michael Cohen
PERSON
Joe Biden
PERSONEpstein Interests
ORGANIZATIONHBRK Associates
ORGANIZATIONGensler
PERSONProduct Data
ORGANIZATIONSubstantial Completion
ORGANIZATIONBasic and Additional Services
ORGANIZATIONStructural Engineering
ORGANIZATIONCivil Engineering
ORGANIZATIONTom Sze
PERSON
Prince Andrew
PERSONSchematic Design Phase
ORGANIZATIONDrawings, Specifications
ORGANIZATIONProject Manual
ORGANIZATIONProject Budget or Project
ORGANIZATIONStandard Terms and Conditions
ORGANIZATIONGensler Standard Billing Rate Schedule
ORGANIZATION