3
Shared Docs
3
Same-Page
3 / 3
Mentions
Commencement of Construction (approx 8 months): January 2009 c) Substantial Completion or Occupancy: August 2010 B. SCOPE OF SERVICES PROVIDED BY GENSLER Client and Gensler will provide the names of their Project team members, including the primary contact person and the person authorized to make dec
ities, septic systems, exterior pavement and curbs for parking, drives, and street connections five feet beyond the building perimeter. c) Soils or Geotechnical Engineering. d) Fire Alarm and Detection Systems Engineering (fire sprinkler system, fire alarm system). e) Design Services related to utilities to be supplie
Commencement of Construction (approx 8 months): January 2009 c) Substantial Completion or Occupancy: August 2010 B. SCOPE OF SERVICES PROVIDED BY GENSLER Client and Gensler will provide the names of their Project team members, including the primary contact person and the person authorized to make dec
ities, septic systems, exterior pavement and curbs for parking, drives, and street connections five feet beyond the building perimeter. c) Soils or Geotechnical Engineering. d) Fire Alarm and Detection Systems Engineering (fire sprinkler system, fire alarm system). e) Design Services related to utilities to be supplie
Commencement of Construction (approx 8 months): January 2009 c) Substantial Completion or Occupancy: August 2010 B. SCOPE OF SERVICES PROVIDED BY GENSLER Client and Gensler will provide the names of their Project team members, including the primary contact person and the person authorized to make dec
ities, septic systems, exterior pavement and curbs for parking, drives, and street connections five feet beyond the building perimeter. c) Soils or Geotechnical Engineering. d) Fire Alarm and Detection Systems Engineering (fire sprinkler system, fire alarm system). e) Design Services related to utilities to be supplie
Entities connected to both GENSLER and Geotechnical Engineering

Jeffrey Epstein
PERSON
Prince Andrew
PERSON
Michael Cohen
PERSON
Joe Biden
PERSONEpstein Interests
ORGANIZATIONHBRK Associates
ORGANIZATIONGensler
PERSONTom Sze
PERSONSchematic Design Phase
ORGANIZATIONDrawings, Specifications
ORGANIZATIONProject Manual
ORGANIZATIONProject Budget or Project
ORGANIZATIONStandard Terms and Conditions
ORGANIZATIONGensler Standard Billing Rate Schedule
ORGANIZATIONWarwick Wicksman Project Principal/Project
ORGANIZATIONProject Designer
ORGANIZATIONProject Architect
ORGANIZATIONGrand Stair
ORGANIZATIONCA Services
ORGANIZATIONATV Garage
ORGANIZATION