The project indudes five main areas: 1. New construction of a Pool Area and subterranean Screening Room, including: 13,700 SF Pool Deck with 2,100 SF Pool, 2,500 Covered Porch, 500 SF Shade Structure, 820 SF Cabana, 350 SF Cabana, two 700 SF Pavilions, a 3000 SF Screening Room, and associated Mechanic
r 18, 2009 Page 11 Attachment B: Scope and Fee Summary I. Pool Area: New Construction Includes East and West Cabanas, North and South Pavilions, Grand Stair, Pool, Pool Deck, and Basement . Architectural services include shell/core services for all areas, and Interior Design services at the Screening Ro
The project Includes five main areas: 1. New construction of a Pool Area and subterranean Screening Room, including: 13,700 SF Pool Deck with 2,100 SF Pool, 2,500 Covered Porch, 500 SF Shade Structure, 820 SF Cabana, 350 SF Cabana, two 700 SF Pavilions, a 3000 SF Screening Room, and associated Mechanic
services Room only! This column Gensler only was paid retainer for this work. progress payment due for up to 60% this scope and South Pavilions, Grand Stair, de slwWcore services for all areas, SD DD CD CA Total Gensler $100,000 $96,000 $222,000 $95,000 $513,000 Structural $9,375 $11,500 $
The project includes five main areas: 1. New construction of a Pool Area and subterranean Screening Room, including: 13,700 SF Pool Deck with 2,100 SF Pool, 2,500 Covered Porch, 500 SF Shade Structure, 820 SF Cabana, 350 SF Cabana, two 700 SF Pavilions, a 3000 SF Screening Room, and associated Mechanic
18, 2009 Page 11 Attachment B: Scope and Fee Summary I Pool Area: New Construction. Includes East and West Cabanas, North and South Pavilions, Grand Stair, Pool, Pool Deck, and Basement . Architectural services include shelUcore services for all areas, and Interior Design services at the Screening Roo
Entities connected to both SF Pool and Grand Stair
Gensler
PERSON
Prince Andrew
PERSON
Michael Cohen
PERSON
Joe Biden
PERSONEpstein Interests
ORGANIZATIONHBRK Associates
ORGANIZATIONTom Sze
PERSOND.1.1 Initial Payment
ORGANIZATIONSchematic Design Phase
ORGANIZATIONDrawings, Specifications
ORGANIZATIONProject Manual
ORGANIZATIONProject Budget or Project
ORGANIZATIONStandard Terms and Conditions
ORGANIZATIONGensler Standard Billing Rate Schedule
ORGANIZATIONWarwick Wicksman Project Principal/Project
ORGANIZATIONProject Designer
ORGANIZATIONProject Architect
ORGANIZATIONCA Services
ORGANIZATIONATV Garage
ORGANIZATIONClient, Contractor
ORGANIZATION