The project indudes five main areas: 1. New construction of a Pool Area and subterranean Screening Room, including: 13,700 SF Pool Deck with 2,100 SF Pool, 2,500 Covered Porch, 500 SF Shade Structure, 820 SF Cabana, 350 SF Cabana, two 700 SF Pavilions, a 3000 SF Screening Room, and associated Mechanic
following documents, in order of precedence: a) amendments and modifications signed by both parties; b) This Letter of Agreement; c) The attached Standard Terms and Conditions (STC); d) The attached Gensler Standard Billing Rate Schedule (Attachment A); e) The detailed fee summary (Attachment B); f) The attached Scope Di
The project Includes five main areas: 1. New construction of a Pool Area and subterranean Screening Room, including: 13,700 SF Pool Deck with 2,100 SF Pool, 2,500 Covered Porch, 500 SF Shade Structure, 820 SF Cabana, 350 SF Cabana, two 700 SF Pavilions, a 3000 SF Screening Room, and associated Mechanic
following documents, in order of precedence: a) amendments and modifications signed by both parties; b) This Letter of Agreement; c) The attached Standard Terms and Conditions (STC); d) The attached Gensler Standard Billing Rate Schedule (Attachment A); e) The detailed fee summary (Attachment B); f) The attached Scope Di
The project includes five main areas: 1. New construction of a Pool Area and subterranean Screening Room, including: 13,700 SF Pool Deck with 2,100 SF Pool, 2,500 Covered Porch, 500 SF Shade Structure, 820 SF Cabana, 350 SF Cabana, two 700 SF Pavilions, a 3000 SF Screening Room, and associated Mechanic
following documents, in order of precedence: a) amendments and modifications signed by both parties; b) This Letter of Agreement; c) The attached Standard Terms and Conditions (STC); d) The attached Gensler Standard Billing Rate Schedule (Attachment A); e) The detailed fee summary (Attachment B); f) The attached Scope Di
Entities connected to both SF Pool and Standard Terms and Conditions

Jeffrey Epstein
PERSONConstruction Administration
ORGANIZATIONthe Schematic Design
ORGANIZATIONSubstantial Completion
ORGANIZATIONEpstein Interests
ORGANIZATIONHBRK Associates
ORGANIZATIONGensler
PERSONProduct Data
ORGANIZATIONBasic and Additional Services
ORGANIZATIONStructural Engineering
ORGANIZATIONCivil Engineering
ORGANIZATIONReimbursable
PERSONBulletins
PERSONFire Alarm
PERSONReview Submittals
PERSONWarwick Ian Wicksman
PERSONAndrew P. Cohen
PERSONRobert Jernigan
PERSONTom Sze
PERSON
Prince Andrew
PERSON