The project indudes five main areas: 1. New construction of a Pool Area and subterranean Screening Room, including: 13,700 SF Pool Deck with 2,100 SF Pool, 2,500 Covered Porch, 500 SF Shade Structure, 820 SF Cabana, 350 SF Cabana, two 700 SF Pavilions, a 3000 SF Screening Room, and associated Mechanic
id upon commencement of each phase of Gensler's and our Consultants' services. a) Schematic Design Phase: $50,000 plus 50% Consultants' SD Fee b) Design Development Phase: $50,000 plus 50% Consultants' DD Fee c) Construction Documents Phase: $100,000 plus 25% Consultants' CD Fee d) Construction Administration Phas
The project Includes five main areas: 1. New construction of a Pool Area and subterranean Screening Room, including: 13,700 SF Pool Deck with 2,100 SF Pool, 2,500 Covered Porch, 500 SF Shade Structure, 820 SF Cabana, 350 SF Cabana, two 700 SF Pavilions, a 3000 SF Screening Room, and associated Mechanic
id upon commencement of each phase of Gensler's and our Consultants' services. a) Schematic Design Phase: $50,000 plus 50% Consultants' SD Fee b) Design Development Phase: $50,000 plus 50% Consultants' DD Fee c) Construction Documents Phase: $100,000 plus 25% Consultants' CD Fee d) Construction Administration Phas
The project includes five main areas: 1. New construction of a Pool Area and subterranean Screening Room, including: 13,700 SF Pool Deck with 2,100 SF Pool, 2,500 Covered Porch, 500 SF Shade Structure, 820 SF Cabana, 350 SF Cabana, two 700 SF Pavilions, a 3000 SF Screening Room, and associated Mechanic
ayment. An initial payment shall be paid upon commencement of each phase of Gensler's and our Consultants' services. a) Schematic Design Phase: b) Design Development Phase: c) Construction Documents Phase: Fee d) Construction Administration Phase: $50,000 plus 50% Consultants' SD Fee $50,000 plus 50% Consultants' D
Entities connected to both SF Pool and Design Development Phase
Reimbursable
PERSON
Jeffrey Epstein
PERSON
Michael Cohen
PERSON
Joe Biden
PERSONEpstein Interests
ORGANIZATIONHBRK Associates
ORGANIZATIONGensler
PERSONProduct Data
ORGANIZATIONSubstantial Completion
ORGANIZATIONBasic and Additional Services
ORGANIZATIONStructural Engineering
ORGANIZATIONCivil Engineering
ORGANIZATIONTom Sze
PERSON
Prince Andrew
PERSONSchematic Design Phase
ORGANIZATIONDrawings, Specifications
ORGANIZATIONProject Manual
ORGANIZATIONProject Budget or Project
ORGANIZATIONStandard Terms and Conditions
ORGANIZATIONGensler Standard Billing Rate Schedule
ORGANIZATION