3
Shared Docs
3
Same-Page
3 / 3
Mentions
The project indudes five main areas: 1. New construction of a Pool Area and subterranean Screening Room, including: 13,700 SF Pool Deck with 2,100 SF Pool, 2,500 Covered Porch, 500 SF Shade Structure, 820 SF Cabana, 350 SF Cabana, two 700 SF Pavilions, a 3000 SF Screening Room, and associated Mechanic
Commencement of Construction (approx 8 months): January 2009 c) Substantial Completion or Occupancy: August 2010 B. SCOPE OF SERVICES PROVIDED BY GENSLER Client and Gensler will provide the names of their Project team members, including the primary contact person and the person authorized to make dec
The project Includes five main areas: 1. New construction of a Pool Area and subterranean Screening Room, including: 13,700 SF Pool Deck with 2,100 SF Pool, 2,500 Covered Porch, 500 SF Shade Structure, 820 SF Cabana, 350 SF Cabana, two 700 SF Pavilions, a 3000 SF Screening Room, and associated Mechanic
Commencement of Construction (approx 8 months): January 2009 c) Substantial Completion or Occupancy: August 2010 B. SCOPE OF SERVICES PROVIDED BY GENSLER Client and Gensler will provide the names of their Project team members, including the primary contact person and the person authorized to make dec
The project includes five main areas: 1. New construction of a Pool Area and subterranean Screening Room, including: 13,700 SF Pool Deck with 2,100 SF Pool, 2,500 Covered Porch, 500 SF Shade Structure, 820 SF Cabana, 350 SF Cabana, two 700 SF Pavilions, a 3000 SF Screening Room, and associated Mechanic
Commencement of Construction (approx 8 months): January 2009 c) Substantial Completion or Occupancy: August 2010 B. SCOPE OF SERVICES PROVIDED BY GENSLER Client and Gensler will provide the names of their Project team members, including the primary contact person and the person authorized to make dec
Entities connected to both SF Pool and GENSLER

Jeffrey Epstein
PERSON
Prince Andrew
PERSON
Michael Cohen
PERSON
Joe Biden
PERSONEpstein Interests
ORGANIZATIONHBRK Associates
ORGANIZATIONGensler
PERSONTom Sze
PERSONSchematic Design Phase
ORGANIZATIONDrawings, Specifications
ORGANIZATIONProject Manual
ORGANIZATIONProject Budget or Project
ORGANIZATIONStandard Terms and Conditions
ORGANIZATIONGensler Standard Billing Rate Schedule
ORGANIZATIONWarwick Wicksman Project Principal/Project
ORGANIZATIONProject Designer
ORGANIZATIONProject Architect
ORGANIZATIONGrand Stair
ORGANIZATIONCA Services
ORGANIZATIONATV Garage
ORGANIZATION