3
Shared Docs
3
Same-Page
3 / 3
Mentions
The project indudes five main areas: 1. New construction of a Pool Area and subterranean Screening Room, including: 13,700 SF Pool Deck with 2,100 SF Pool, 2,500 Covered Porch, 500 SF Shade Structure, 820 SF Cabana, 350 SF Cabana, two 700 SF Pavilions, a 3000 SF Screening Room, and associated Mechanic
oject. phase One - Design 1. Schematic Design. Based on the approved Conceptual Design and Client's authorization to proceed, Gensler will develop the Schematic Design, consisting of: a) Site plan; b) Building elevations; c) Typical building sections; d) Floor plans; e) Outline description of building systems
The project Includes five main areas: 1. New construction of a Pool Area and subterranean Screening Room, including: 13,700 SF Pool Deck with 2,100 SF Pool, 2,500 Covered Porch, 500 SF Shade Structure, 820 SF Cabana, 350 SF Cabana, two 700 SF Pavilions, a 3000 SF Screening Room, and associated Mechanic
oject. phase One - Design 1. Schematic Design. Based on the approved Conceptual Design and Client's authorization to proceed, Gensler will develop the Schematic Design, consisting of: a) Site plan; b) Building elevations; c) Typical building sections; d) Floor plans; e) Outline description of building systems
The project includes five main areas: 1. New construction of a Pool Area and subterranean Screening Room, including: 13,700 SF Pool Deck with 2,100 SF Pool, 2,500 Covered Porch, 500 SF Shade Structure, 820 SF Cabana, 350 SF Cabana, two 700 SF Pavilions, a 3000 SF Screening Room, and associated Mechanic
oject. Phase One - Design 1. Schematic Design. Based on the approved Conceptual Design and Client's authorization to proceed, Gensler will develop the Schematic Design, consisting of: a) Site plan; b) Building elevations; c) Typical building sections; d) Floor plans; e) Outline description of building systems
Entities connected to both SF Pool and the Schematic Design

Jeffrey Epstein
PERSONConstruction Administration
ORGANIZATIONStandard Terms and Conditions
ORGANIZATIONSubstantial Completion
ORGANIZATIONEpstein Interests
ORGANIZATIONHBRK Associates
ORGANIZATIONGensler
PERSONProduct Data
ORGANIZATIONBasic and Additional Services
ORGANIZATIONStructural Engineering
ORGANIZATIONCivil Engineering
ORGANIZATIONReimbursable
PERSONBulletins
PERSONFire Alarm
PERSONReview Submittals
PERSONWarwick Ian Wicksman
PERSONAndrew P. Cohen
PERSONRobert Jernigan
PERSONTom Sze
PERSON
Prince Andrew
PERSON