he coast of St. Thomas. The project indudes five main areas: 1. New construction of a Pool Area and subterranean Screening Room, including: 13,700 SF Pool Deck with 2,100 SF Pool, 2,500 Covered Porch, 500 SF Shade Structure, 820 SF Cabana, 350 SF Cabana, two 700 SF Pavilions, a 3000 SF Screening Room, and
dates outlined in the Project Schedule in the agreement, Architect's compensation shall be equitably adjusted. I Giesler STC 080220 85 Change In Project Scope. If portions of the Project are deleted or otherwise not constructed, compensation for those portions of the Project shall be payable to the extent
e coast of St. Thomas. The project Includes five main areas: 1. New construction of a Pool Area and subterranean Screening Room, including: 13,700 SF Pool Deck with 2,100 SF Pool, 2,500 Covered Porch, 500 SF Shade Structure, 820 SF Cabana, 350 SF Cabana, two 700 SF Pavilions, a 3000 SF Screening Room, and
dates outlined in the Project Schedule in the agreement, Architect's compensation shall be equitably adjusted. I Giesler STC 080220 85 Change In Project Scope. If portions of the Project are deleted or otherwise not constructed, compensation for those portions of the Project shall be payable to the extent
e coast of St. Thomas. The project includes five main areas: 1. New construction of a Pool Area and subterranean Screening Room, including: 13,700 SF Pool Deck with 2,100 SF Pool, 2,500 Covered Porch, 500 SF Shade Structure, 820 SF Cabana, 350 SF Cabana, two 700 SF Pavilions, a 3000 SF Screening Room, and
180) days beyond the dates outlined in the Project Schedule in the agreement, Architect's compensation shall be equitably adjusted. 8.5 Change In Project Scope. If portions of the Project are deleted or otherwise not constructed, compensation for those portions of the Project shall be payable to the extent
Entities connected to both SF Pool Deck and Project Scope
Gensler
PERSONBasic and Additional Services
ORGANIZATIONDesign/Build
ORGANIZATIONSeparate Consultants
ORGANIZATIONReimbursable
PERSONLimitations of Construction Responsibilities
ORGANIZATIONthe Project, Client
ORGANIZATIONDesign/Build by Contractor
ORGANIZATIONClient, Contractor
ORGANIZATIONCivil Engineering
ORGANIZATIONConstruction Administration
ORGANIZATIONBulletins
PERSONFire Alarm
PERSONReview Submittals
PERSONWarwick Ian Wicksman
PERSONAndrew P. Cohen
PERSONRobert Jernigan
PERSON
Jeffrey Epstein
PERSONBob Anderson
PERSONArchitectural Services
ORGANIZATION