ttachment A: Gensler Standard Hourly Billina Rates Warwick Wicksman Project Principal/Project Manager $230.00 Tom Sze Project Designer $180.00 Bob Anderson Project Architect $150.00 Senior Professional Staff $140.00 - $200.00 Intermediate Professional Staff $85.00 - $135.00 Junior Professional Sta
nation. • Plus standard reimbursable expenses. • * Allowance, to be billed hourly *** Pool CD/CA Services pending further review by the Owner. 2. ATV Garage New construction. Assumes all design services are performed in conjunction with the Pool Area work described above, and are integrated into one set
ttachment A: Gensler Standard Hourly Billina Rates Warwick Wicksman Project Principal/Project Manager $230.00 Tom Sze Project Designer $180.00 Bob Anderson Project Architect $150.00 Senior Professional Staff $140.00 - $200.00 Intermediate Professional Staff $85.00 - $135.00 Junior Professional Sta
ination. • Plus standard reimbursable expenses. ** Allowance, to be billed hourly ••• Pool CD/CA Services pending further review by the Owner. 2. ATV Garage New construction. Assumes all design services me performed in conjunction with the Pool Area work described above, and are integrated into one set
ttachment A: Gensler Standard Hourly Billing Rates Warwick Wicksman Project Principal/Project Manager $230.00 Tom Sze Project Designer $180.00 Bob Anderson Project Architect $150.00 Senior Professional Staff $140.00 - $200.00 Intermediate Professional Staff $85.00 - $135.00 Junior Professional Sta
dination. * Plus standard reimbursable expenses. " Allowance, to be billed hourly *** Pool CD/CA Services pending further review by the Owner. 2. ATV Garage: New construction. Assumes all design services are performed in conjunction with the Pool Area work described above, and are integrated into one se
e was the downdraft on landing blowing inotthe building On Mon, Apr 27, 2009 at 5:42 PM, Silvina Royston wrote: Jeffrey, I've been in touch with Bob Anderson at Gensler regarding the Helipad design. I've been updating him with existing conditions. Bob had questions re: the required lighting and area Larr
tions. Bob had questions re: the required lighting and area Larry requires for landing. Brice reviewed with Larry whose advice is to locate the new ATV Garage not where the existing building is but across the road from it. Bob is working on this scheme. Regards, Silvina E FTA_R 1 _O 0204 4 02 EFTA0182
Entities connected to both Bob Anderson and ATV Garage

Jeffrey Epstein
PERSONGensler
PERSON
Santa Monica
LOCATION
Prince Andrew
PERSONHBRK Associates
ORGANIZATIONProduct Data
ORGANIZATIONSubstantial Completion
ORGANIZATIONBasic and Additional Services
ORGANIZATIONStructural Engineering
ORGANIZATIONCivil Engineering
ORGANIZATIONReimbursable
PERSONConstruction Administration
ORGANIZATIONBulletins
PERSONFire Alarm
PERSONReview Submittals
PERSONWarwick Ian Wicksman
PERSONAndrew P. Cohen
PERSONRobert Jernigan
PERSONTom Sze
PERSON
Michael Cohen
PERSON