3
Shared Docs
3
Same-Page
3 / 3
Mentions
ide services on the Project (the date we received the Schematic Design Phase initial payment), on or about January 13, 2009. By Gensler By Client Warwick Ian Wicksman, AIA fel& Dv AtmAin (Signature) Principal, it 91° 47 (Title) (Date) On behalf of Andrew P. Cohen Executive Director - Santa Monica Califor
g perimeter. c) Soils or Geotechnical Engineering. d) Fire Alarm and Detection Systems Engineering (fire sprinkler system, fire alarm system). e) Design Services related to utilities to be supplied to the building, including water supply and storage, electrical supply and transformers, propane, and septic sy
ide services on the Project (the date we received the Schematic Design Phase initial payment), on or about January 13, 2009. By Gensler By Client Warwick Ian Wicksman. AIA fel& Dv entmAm. (Signature) Principal. (Title) (Printe /I9•01 Ls, atur (Date) (Title) On behalf of Andrew P. Cohen Executive Direct
g perimeter. c) Soils or Geotechnical Engineering. d) Fire Alarm and Detection Systems Engineering (fire sprinkler system, fire alarm system). e) Design Services related to utilities to be supplied to the building, including water supply and storage, electrical supply and transformers, propane, and septic sy
ted to provide services on the Project (the date we received the Schematic Design Phase initial payment), on or about January 13, 2009. By Gensler Warwick Ian Wicksman, AIA By Client (Printed Name of Signatory) By B (Signature) (Signature) principal (Title) (Date) (Title) (Date) On behalf of Andrew P. Coh
g perimeter. c) Soils or Geotechnical Engineering. d) Fire Alarm and Detection Systems Engineering (fire sprinkler system, fire alarm system). e) Design Services related to utilities to be supplied to the building, including water supply and storage, electrical supply and transformers, propane, and septic sy
Entities connected to both Warwick Ian Wicksman and Design Services

Jeffrey Epstein
PERSONGensler
PERSON
Michael Cohen
PERSON
Joe Biden
PERSONEpstein Interests
ORGANIZATIONHBRK Associates
ORGANIZATIONBob Anderson
PERSON
Prince Andrew
PERSONSchematic Design Phase
ORGANIZATIONDrawings, Specifications
ORGANIZATIONProject Manual
ORGANIZATIONProject Budget or Project
ORGANIZATIONStandard Terms and Conditions
ORGANIZATIONGensler Standard Billing Rate Schedule
ORGANIZATIONWarwick Wicksman Project Principal/Project
ORGANIZATIONProject Designer
ORGANIZATIONProject Architect
ORGANIZATIONGrand Stair
ORGANIZATIONCA Services
ORGANIZATIONATV Garage
ORGANIZATION