r pavement and curbs for parking, drives, and street connections five feet beyond the building perimeter. c) Soils or Geotechnical Engineering. d) Fire Alarm and Detection Systems Engineering (fire sprinkler system, fire alarm system). e) Design Services related to utilities to be supplied to the buildin
dates outlined in the Project Schedule in the agreement, Architect's compensation shall be equitably adjusted. I Giesler STC 080220 85 Change In Project Scope. If portions of the Project are deleted or otherwise not constructed, compensation for those portions of the Project shall be payable to the extent
r pavement and curbs for parking, drives, and street connections five feet beyond the building perimeter. c) Soils or Geotechnical Engineering. d) Fire Alarm and Detection Systems Engineering (fire sprinkler system, fire alarm system). e) Design Services related to utilities to be supplied to the buildin
dates outlined in the Project Schedule in the agreement, Architect's compensation shall be equitably adjusted. I Giesler STC 080220 85 Change In Project Scope. If portions of the Project are deleted or otherwise not constructed, compensation for those portions of the Project shall be payable to the extent
r pavement and curbs for parking, drives, and street connections five feet beyond the building perimeter. c) Soils or Geotechnical Engineering. d) Fire Alarm and Detection Systems Engineering (fire sprinkler system, fire alarm system). e) Design Services related to utilities to be supplied to the buildin
180) days beyond the dates outlined in the Project Schedule in the agreement, Architect's compensation shall be equitably adjusted. 8.5 Change In Project Scope. If portions of the Project are deleted or otherwise not constructed, compensation for those portions of the Project shall be payable to the extent
Entities connected to both Fire Alarm and Project Scope
the Project, Client
ORGANIZATION
Jeffrey Epstein
PERSONDesign/Build by Contractor
ORGANIZATIONGensler
PERSONBasic and Additional Services
ORGANIZATIONDesign/Build
ORGANIZATIONLimitations of Construction Responsibilities
ORGANIZATIONSeparate Consultants
ORGANIZATIONReimbursable
PERSONClient, Contractor
ORGANIZATIONConstruction Administration
ORGANIZATIONBulletins
PERSONReview Submittals
PERSONWarwick Ian Wicksman
PERSONAndrew P. Cohen
PERSONRobert Jernigan
PERSONTom Sze
PERSONBob Anderson
PERSONArchitectural Services
ORGANIZATIONProject Description
ORGANIZATION