r pavement and curbs for parking, drives, and street connections five feet beyond the building perimeter. c) Soils or Geotechnical Engineering. d) Fire Alarm and Detection Systems Engineering (fire sprinkler system, fire alarm system). e) Design Services related to utilities to be supplied to the buildin
hanges. Gensler may authorize minor changes in the Work if they are consistent with the aesthetic design Intent and do not involve an adjustment in the Project Budget or Schedule. 3.4. Contractor's Payment Applications. Gensler will review Contractor's monthly payment applications and make recommendations to Client regarding
r pavement and curbs for parking, drives, and street connections five feet beyond the building perimeter. c) Soils or Geotechnical Engineering. d) Fire Alarm and Detection Systems Engineering (fire sprinkler system, fire alarm system). e) Design Services related to utilities to be supplied to the buildin
hanges. Gensler may authorize minor changes in the Work if they are consistent with the aesthetic design Intent and do not involve an adjustment in the Project Budget or Schedule. 3.4. Contractor's Payment Applications. Gensler will review Contractor's monthly payment applications and make recommendations to Client regarding
r pavement and curbs for parking, drives, and street connections five feet beyond the building perimeter. c) Soils or Geotechnical Engineering. d) Fire Alarm and Detection Systems Engineering (fire sprinkler system, fire alarm system). e) Design Services related to utilities to be supplied to the buildin
hanges. Gensler may authorize minor changes in the Work if they are consistent with the aesthetic design intent and do not involve an adjustment in the Project Budget or Schedule. 3.4. Contractor's Payment Applications. Gensler will review Contractor's monthly payment applications and make recommendations to Client regarding
Entities connected to both Fire Alarm and the Project Budget or Schedule

Jeffrey Epstein
PERSON
Prince Andrew
PERSON
Michael Cohen
PERSON
Joe Biden
PERSONEpstein Interests
ORGANIZATIONHBRK Associates
ORGANIZATIONGensler
PERSONBob Anderson
PERSONSchematic Design Phase
ORGANIZATIONDrawings, Specifications
ORGANIZATIONProject Manual
ORGANIZATIONProject Budget or Project
ORGANIZATIONStandard Terms and Conditions
ORGANIZATIONGensler Standard Billing Rate Schedule
ORGANIZATIONWarwick Wicksman Project Principal/Project
ORGANIZATIONProject Designer
ORGANIZATIONProject Architect
ORGANIZATIONGrand Stair
ORGANIZATIONCA Services
ORGANIZATIONATV Garage
ORGANIZATION