r pavement and curbs for parking, drives, and street connections five feet beyond the building perimeter. c) Soils or Geotechnical Engineering. d) Fire Alarm and Detection Systems Engineering (fire sprinkler system, fire alarm system). e) Design Services related to utilities to be supplied to the buildin
(approx 6 weeks): December 2008 • Design Development (approx 8 weeks): April 2009 • Construction Documents (approx 12 weeks): September 2009 b) Commencement of Construction (approx 8 months): January 2009 c) Substantial Completion or Occupancy: August 2010 B. SCOPE OF SERVICES PROVIDED BY GENSLER Client and Gensler
r pavement and curbs for parking, drives, and street connections five feet beyond the building perimeter. c) Soils or Geotechnical Engineering. d) Fire Alarm and Detection Systems Engineering (fire sprinkler system, fire alarm system). e) Design Services related to utilities to be supplied to the buildin
(approx 6 weeks): December 2008 • Design Development (approx 8 weeks): April 2009 • Construction Documents (approx 12 weeks): September 2009 b) Commencement of Construction (approx 8 months): January 2009 c) Substantial Completion or Occupancy: August 2010 B. SCOPE OF SERVICES PROVIDED BY GENSLER Client and Gensler
r pavement and curbs for parking, drives, and street connections five feet beyond the building perimeter. c) Soils or Geotechnical Engineering. d) Fire Alarm and Detection Systems Engineering (fire sprinkler system, fire alarm system). e) Design Services related to utilities to be supplied to the buildin
pprox 6 weeks): December 2008 • Design Development (approx 8 weeks): April 2009 • Construction Documents (approx 12 weeks): September 2009 b) Commencement of Construction (approx 8 months): January 2009 c) Substantial Completion or Occupancy: August 2010 B. SCOPE OF SERVICES PROVIDED BY GENSLER Client and Gensler
Entities connected to both Fire Alarm and Commencement of Construction

Jeffrey Epstein
PERSON
Prince Andrew
PERSON
Michael Cohen
PERSON
Joe Biden
PERSONEpstein Interests
ORGANIZATIONHBRK Associates
ORGANIZATIONGensler
PERSONBob Anderson
PERSONSchematic Design Phase
ORGANIZATIONDrawings, Specifications
ORGANIZATIONProject Manual
ORGANIZATIONProject Budget or Project
ORGANIZATIONStandard Terms and Conditions
ORGANIZATIONGensler Standard Billing Rate Schedule
ORGANIZATIONWarwick Wicksman Project Principal/Project
ORGANIZATIONProject Designer
ORGANIZATIONProject Architect
ORGANIZATIONGrand Stair
ORGANIZATIONCA Services
ORGANIZATIONATV Garage